Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimum embankment design for a tailings damBy A Fyans, B Ghahreman-Nejad
This paper discusses the method and results of an options study into selection of the optimal form for a 130 m high tailings/water retaining dam, located in a region of high seismicity in central Iran
Jul 23, 2018
-
The Use of Roadheading Machines in the Construction of the Liverpool Link LineBy Parkes DB
The excavation of sandstone of generally medium strength for the Liverpool Link Line by Dosco Mark 2A Roadheaders has demonstrated the versatility and good performance of road- headers in suitable
Jan 1, 1976
-
Real-time fluorine mineral sensor – taking research to prototypeBy J Moffatt, T Payten, N Spooner, L Teixeira, L A. Balzan, G Wilkie, G Tsiminis
Fluorine is a penalty element due to its reactive nature. In acidic environments many fluorine minerals dissolve to form hydrofluoric acid (HF), changing processing conditions. When smelted HF can be
Aug 24, 2022
-
A Phased Approach to Test Programs to Meet Feasibility Study RequirementsBy E Williams
The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re
Oct 5, 2011
-
Description of Transportable Bulk Testing Plants for use in Diamond ExplorationDiamond bearing deposits are extremely low grade and require large bulk samples to be tested to determine the grade and quality of the stones. The semi portable plants, for treatment of these bulk
Jan 1, 1984
-
Developing Mineral Reporting CompetencyBy J Coombes
The JORC Code lists the three core principles of Transparency, Materiality and Competency as fundamental to how mineral estimates are publicly reported. But where the principles of Transparency and Ma
Aug 22, 2011
-
Evaluation of thermal conductivities of molten SiO2-Al2O3-CaO slagsBy M Zhu, G Tranell, J You, K Tang, X Ma
The thermal conductivity of slag is critical for the efficiency of high temperature metallurgical processes such as the smelting reduction of ferroalloys, the ladle refining and the continuous casting
Aug 21, 2024
-
Lihir Gold Five Years On ù Maximising Throughput and Capital UtilisationDuring the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future
Jan 1, 2003
-
Iron Blast Furnace Combustion Reactions-Formation of Silicon Monoxide in the RacewayBy Cripps-Clark CJ, Deague TK
In order to study conditions under which SiO(g) may be formed in a blast furnace, equilibrium phase diagrams were constructed for the combustion of high and low ash cokes with oxygen-enriched blas
Jan 1, 1980
-
The Manufacture of Ferro Manganese and Alloy Steels in the Electric FurnaceIn recent years, the. art of electric steelmaking has received a great deal of attention, and naturally, much controversy has existed from time to time regarding the relative merits of different pract
Jan 1, 1951
-
Yilgarn Star ù Just in Time Methodology ù Planning and Scheduling ImplicationsBy G Haywood
This paper presents the evolution of the planning, scheduling and mining practices at the Yilgarn Star underground. The paper will concentrate on the principals of æjust in timeÆ and the impact of suc
Jan 1, 2002
-
Ambuklao Tunnel Plug ConstructionBy B Hayes
The Ambuklao and Binga Rehabilitation Project is a 175 MW hydro power project currently under construction across dual sites in the north region of Luzon Island, Philippines. When it was built in 1956
Mar 8, 2011
-
The Electronic Delay Detonator Trial at KCGM Mount Charlotte OperationBy D Caffrey
To demonstrate the advantages of using electronic delay detonators over pyrotechnic detonators, a trial using the DNES Dynatronic System was conducted at the KCGM Mount Charlotte operation in 1998. Th
Jan 1, 1999
-
The Benefits of Using SmartEar™at Pueblo ViejoBy D Shuen, R Sales, D La Rosa
Semi-autogenous grinding (SAG) mill control is complex and depends on many dynamic process variables. Good control strategies ensure that a mill is operating as close to optimal as possible, resulting
Sep 1, 2014
-
The Role of Flotation Frothers in the Particle-Bubble Attachment ProcessBy He BQ
Static attachment of bubbles to solids is contrasted with dynamic attachment in flotation cells. The times of contact during particle-bubble collisions in dynamic attachment are compared with the
Jan 1, 1984
-
The Evolution of Diamond Drilling Practices at Olympic DamBy J Taylor, A Dubowik
To increase the efficiency and improve the quality of diamond drilling at Olympic Dam, mine geologists have adapted and modified common practices in order to overcome the challenges imposed by such a
Aug 18, 2014
-
Decision Support for an Underground Gold Mining Operation - A Case Study using the Schedule Optimisation ToolBy B Maybee, L Fava, D Millar
In the context of a case study for an underground gold mine, the value generated by a schedule optimisation tool (SOT) is assessed. SOT is a software tool for underground mine planning that maximises
May 24, 2012
-
Viscosity of CaO-aluminosilicate slagsBy R G. Reddy, Z Zhang
Viscosities of CaO-aluminosilicate ternary melts were estimated using a structure-based model. The model considers depolymerisation effects and related breakdown of the silicate network structure on t
Aug 21, 2024
-
Recent Advances in Gold MetallurgyRecent and on-going studies on the leaching of gold, the properties and activity of carbon, developments in the elution of gold from carbon, and methods of recovering gold from solution are review
Jan 1, 1987
-
Optimal Resource UtilisationBy D von Horn
Mineral sand orebodies are typically mined for their TiO2 content. Increasingly over the past 30 years, the major mineral focus has shifted from natural rutile to ilmenite and an acceptance that the l
Jan 1, 2001