    Raise bore stability and risk assessment empirical database update

    By A Penney, M J. Pascoe, R M. Stephenson

    The empirical McCracken and Stacey stability and risk assessment method has been in use for more than 20 years to assess geotechnical stability issues for raise bored shafts. The methodology has been

    Nov 30, 2018

  • AUSIMM
    Design and Construction of the Access Tunnels for the New Top Ryde City Shopping Centre, Northern Sydney

    By Q Yang

    This paper describes the design and construction of three 7.2 m span access ramp-tunnels to the three level underground car park of the newly redeveloped Top Ryde City Shopping Centre in northern Sydn

    Mar 8, 2011

  • AUSIMM
    Blast Vibration Monitoring and Elastic Wave Reflection Models to Assess Blast-Induced Damage to Mine Infrastructure - An Underground Case Study

    During underground mining, rock mass changes can occur as a function of the mining sequence and excavation processes. Mining-induced rock mass damage can occur due to redistribution of static stresses

    Dec 6, 2010

  • AUSIMM
    Optimum Dig Lines for Open Pit Grade Control

    By I Treloar, T Elenbaas, E Isaaks

    Critical reviews of grade control generally focus on blasthole sampling and the estimation of ore control block model (OCM) grades, with little or no attention given to dig-line design. For example, t

    Aug 18, 2014

  • AUSIMM
    Justifying Slope Design Risks and Costs

    By N M. Player, R P. Varden, E Jones

    "An effective geotechnical design provides an accurate and appropriate assessment, balanced with a mining company’s risk profile. Justifying the cost of slope assessment requires an understanding of t

    Nov 15, 2016

  • AUSIMM
    Experimental Validation of the Discrete Element Method (DEM)

    By W Wu

    The prospect of discrete element modelling (DEM) being used as an everyday design tool for transfer chutes in the iron ore mining industry is becoming more and more probable. However, much care needs

    Jan 1, 2007

  • AUSIMM
    Evaluation of a New Vision System Algorithm for Automated Fragmentation Measurement from a Shovel

    By M J. Noy

    The automated measurement of rock fragmentation particle size distribution in the muck during muck excavation has been developing over the last 16 years. The introduction of stereo camera imaging of t

    Aug 24, 2015

  • AUSIMM
    Two Colombian Tunnels

    The 5.6 km Canning Tunnel was constructed to improve water supply from Canning Dam to the Perth metropolitan area. The site area is in the Darling Range which is essentially a laterite-capped plate

    Jan 1, 1976

  • AUSIMM
    An Investigation of Expanding Split Sets in Weak Ground

    By G Davison, C Rossimel, M Bouazza

    Expanding rock bolts anchor within a rock mass more efficiently than non-expanding varieties. This is of great importance in weak ground conditions, where grouted friction bolts perform less efficient

    Mar 24, 2014

  • AUSIMM
    Back analysis of pit slope performance in a saturated alluvial sediment

    By J Player, G Sweby

    The material properties and hence performance of saturated alluvial sediments slope can be incorrectly forecast if the water content is not preserved, and materials properties not correctly determined

    Jun 22, 2022

  • AUSIMM
    Reducing the Energy Required in Grinding Clinker to Cement – Some Case Studies

    By H Benzer

    Grinding clinker to finished cement consumes more energy than any other comminution process. World production of cement in 2009 was 2840 million tonnes and the energy required for comminution was 40-6

    Aug 8, 2011

  • AUSIMM
    Assessing Uncertainty with Drill Hole Spacing Studies – Applications to Mineral Resources

    By H M. Parker, G Verly, T Postolski

    Assessing the uncertainty and risk in mineral resource estimation is required for best practice and is implied by the public reporting codes in the categorisation of mineral resources and reserves. On

    Nov 24, 2014

  • AUSIMM
    Online FTIR analysis for improved efficiency in alumina production

    By K Haroon, J D. Speed, S P. Wood

    Online analysis of continuous and batch processes has seen a dramatic increase in recent years, with examples ranging from petrochemicals to pharmaceuticals, to industrial biotechnology and food and d

    Aug 24, 2022

  • AUSIMM
    Geotechnical monitoring at the Porgera Mine

    By Yambu J, Titus K

    Geotechnical investictations and monitoring have been integral to development of the Porgera Gold Mine. The steep, unstable terrain has required a program for monitoring of slopes and foundations whic

    Jan 1, 1994

  • AUSIMM
    The Influence of Pyrite on Galena Oxidation and Subsequent Flotation

    Folklore suggests that oxidation is detrimental to sulfide mineral flotation, and in many instances is the reason given for values reporting in the tailing. However, while a considerable body of work

    Jan 1, 2005

  • AUSIMM
    A Non-Parametric Bayesian Framework for Automatic Block Estimation

    By A Melkumyan, F Ramos

    This paper addresses the problem of prediction of grade variables over volumes (block estimation) for an autonomous mine. Resource estimation is usually concerned with the prediction of the quality of

    Sep 26, 2011

  • AUSIMM
    Chirano Gold Mine Expansion – A Case Study

    By S Ellis

    In January 2008 Chirano Gold Mines Limited committed to expansion of the Chirano Gold Project from its existing design capacity of 2 Mtpa ROM ore to a new design value of 3.5 Mtpa. In addition to incr

    Aug 8, 2011

  • AUSIMM
    Minimising cost of rheology control additives for iron ore slurries/tailings for enhancing processing performance

    By Y K. Leong

    Occasionally additives are used in the wet processing of iron ore tailings and slurries, for examples, in the thickening of tailings with flocculant to recover process water, and in the smooth pumping

    Sep 18, 2023

  • AUSIMM
    Parallel Implementation of a Tabu Search Procedure for Stochastic Mine Scheduling

    By R Dimitrakopoulos, R Senécal

    This paper presents a metaheuristic solution to the optimisation of open pit long-term production scheduling with a stockpile and geological uncertainty. The optimisation formulation is a two-stage st

    Nov 24, 2014

  • AUSIMM
    Solving a Large Stochastic Integer Programming Model for Production Scheduling at a Gold Mine with Multiple Processing Streams and Uncertain Geology

    By M de Freitas Silva

    One of the main steps during the decision-making process of long-term mine planning is the definition of the optimal sequence of extraction, which usually is synonymous with maximising the discounted

    Nov 24, 2014