Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Capital Expenditure Modelling for Strategic Mine Scheduling

    By L Blackwell

    Strategic mine scheduling is an industry best practice for increasing the long-term value of mining operations and supply chains. The application of optimisation technology such as mixed integer linea

    Nov 24, 2014

  • AUSIMM
    ‘MRC-wiki’ – a Mine Rehabilitation and Closure Knowledge Management Tool for Central Queensland Coalmine Practitioners

    By C J. Unger, T Baumgartl, C J. Bond, P Sabourenkov, V C. Glenn

    Social licence to mine is influenced by society’s perception of the mining sector’s ability to effectively rehabilitate mined land and for governments to appropriately regulate that process for the br

    Jun 28, 2016

  • AUSIMM
    Adding Copper Recovery and Acid Consumption Variables to the Geological Model of Quebrada Blanca

    By R Schiller, E Chait

    "Quebrada Blanca is a porphyry copper deposit located in the Eocene-Oligocene belt of Chilean Andes. Operation started in 1994 and original reserves for supergene mineralisation gave a life-of-mine (L

    Jun 15, 2016

  • AUSIMM
    Improving Blasting by a Team Approach at the Henty Gold Mine

    By R Wedmaier

    Henty Gold Mine is an underground operation producing 100 000 ounces of gold per annum. The original mining method used was flatbacking with paste fill. However, a non-entry method û uphole benching û

    Jan 1, 2001

  • AUSIMM
    A review of the AARL process for the elution of gold from activated carbon

    By Schmidt CG

    Parameters affecting gold elution using the AARL process are reviewed and critically analyzed in an attempt to optimise metallurgical efficiency and minimise costs in both current and future carbon

    Jan 1, 1986

  • AUSIMM
    Long-Term Water Management - The Forgotten Legacy of Mine Closure

    By G Byrne

    Long-term water management is typically ignored in mine closure planning. A review of 73 mine closure plans dating from 2007 to 2013 shows that, on average, relinquishment is proposed to be achieved i

    Nov 26, 2013

  • AUSIMM
    The Control of Hydro Power Distribution System in Deep Mines

    By Wymer DG

    The concept of hydro power in deep mines is based on the exploitation of the hydrostatic head that can be gained as refrigerated cooling water descends in shaft pipe columns from the surface, to provi

    Jan 1, 1985

  • AUSIMM
    Orebody Solid Modelling Accuracy ù A Comparison of Explicit and Implicit Modelling Techniques Using a Practical Example from the Hope Bay District, Nunavut, Canada

    Accurate geometric models of orebodies establish the framework for reliable mineral resource estimates that provide a basis for further exploration and mine planning, as well as for financial models t

    Jan 1, 2006

  • AUSIMM
    Mining Exploration Data, Information Theory, and Sampling Practices

    Methods for ore reserve estimation are classified. The amount of information needed to asses ore reserves is analysed. Reference is made to gold sampling. Consideration is given to nugget effects a

    Jan 1, 1997

  • AUSIMM
    Ventilation Surveys and Model Building - A ConsultantÆs Opinion

    By J Rowland

    "This paper was primarily put together in order to demonstrate what are believed to be acceptablestandards, in relation to ventilation surveys and the subsequent model assembly process. Thiswas brough

    Jun 1, 2012

  • AUSIMM
    Realising the Potential of the Boolgeeda Iron Formation – Stratigraphy and Iron Mineralisation at McCamey’s North, Hamersley Province, Western Australia

    By P J. Howard

    Atlas Iron Limited’s McCamey’s North project lies at the eastern end of the Hamersley Basin, approximately 50 km east of Newman, Western Australia, and 3 km northeast of BHP Billiton’s Jimblebar Mine.

    Jul 11, 2011

  • AUSIMM
    Analysis of premature failure of rock bolts and cable bolts failed in underground coal mines

    By P Craig, A Crosky, H Ramandi, S Saydam, H Chen

    Frequency of reports on premature failure of rock bolts and cable bolts have increased in past two decades. Such a failure threatens both the safety of underground mine workers and the economic viabil

    Nov 30, 2018

  • AUSIMM
    Design and Construction Contract C916 Beauty World Station and Tunnels, Singapore

    By R McDonough

    DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal

    Sep 17, 2014

  • AUSIMM
    Attractive Workplaces in Future Deep Metal Mining

    By B Johansson

    The mining industry needs to recruit young talented people. An important task therefore, is to create future attractive mining workplaces that engage and motivate young people to work within the indus

    Nov 22, 2011

  • AUSIMM
    Sampling Systems for Process Control and Metallurgical Accounting

    By F F. Pitard

    The optimisation of a metallurgical plant requires two kinds of sampling systems. The first provides samples to follow process changes, so in due time actions to maintain key parameters within pre-est

    Jul 29, 2014

  • AUSIMM
    Advancing diversity and inclusivity in the resources sector – a human centred focus on equipment design

    By R Burgess-Limerick, D Lynas

    A number of standards and guidance materials currently exist to assist equipment designers. The ISO process, however, is a formal process and change often lags behind technology development. In some c

    Apr 16, 2024

  • AUSIMM
    Reduction of Iron Content from Silica by Gravitational Processes

    Reduction of Iron Content from Silica by Gravitational Processes In this research work, it was attempted to reduce the iron contents (Fe2O3) in silica sample which was provided from Shenin silica min

    Sep 13, 2010

  • AUSIMM
    Geomechanical modelling of the Ernest Henry iron oxide copper gold deposit – identifying fluid pathways to predict potential mineralised zones

    By J G. McLellan, B Miller

    Copper and Gold mineralisation at the Ernest Henry deposit is bound by two controlling shears along the hanging wall and footwall margins. The shear zone geometries have been influenced by a large dio

    Sep 20, 2017

  • AUSIMM
    Phase Equilibria and Thermodynamics of Zinc Fuming Slags

    By P Hayes, B Zhao

    A range of materials are treated in zinc fuming processes to recover metal values and produce benign slag waste products. The selection of the optimum process conditions in these various technologies

    Jan 1, 2000

  • AUSIMM
    Phanerozoic Ooidal Ironstone Deposits - Generation of Potential Exploration Targets

    By E R. Ramanaidou, M Wells

    The aim of this paper is to summarise all known Phanerozoic ooidal ironstone deposits worldwide, including Australian deposits such as the well-known channel iron deposits (CID). Nearly 400 occurrence

    Jan 1, 2009