Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Using high-efficiency downhole assay to improve the financial performance of open pit copper mining operations

    By H Rossiter, A Maddever, J Market, P Jeanneau, A Virani

    It is generally acknowledged that the head grade of the world’s copper resources is declining. Accordingly, there is an increase in the volume of resource material being mined and processed to maintai

    Nov 10, 2020

  • AUSIMM
    ACARP Belt Press Filter Design, Operation and Maintenance Handbook

    By D Eschebach, D Mathewson

    A belt press filter (BPF) handbook containing practical information for the reference of plant designers and operators has been created as part of Australian Coal Association Research Program project

    Jul 27, 2015

  • AUSIMM
    Iron Ore Grade Control for Flitch Mining – An Alternative Method for the Hope Downs Operation, Hamersley Province, Western Australia

    By A D. Caccioppoli

    Grade control systems within Rio Tinto Iron Ore have proven to be robust, when mining full benches. The Hope Downs 1 operation hosting two Marra Mamba Iron Formation deposits (North and South Deposits

    Aug 22, 2011

  • AUSIMM
    Fluid Pressure, Geomechanical Evolution and Predictive Targeting of the Sunrise Dam Gold Deposit, Western Australia

    By M J. Nugus, J G. McLellan, T G. Blenkinsop

    High fluid pressures and deformation have been instrumental in the formation of high-grade gold lodes at the Archaean granite greenstone 12 Moz Sunrise Dam gold deposit in Western Australia. Historica

    Sep 26, 2013

  • AUSIMM
    No entry mechanised presink of the Wira Hoisting Shaf

    By D Kilkenny

    This paper discusses the use of a mechanised shaft sinking machine Herrenknecht Vertical Shaft Sinking Machine (VSM) – to conduct the 93 m presink for the Wira Hoisting Shaft at the Prominent Hill Min

    Mar 29, 2023

  • AUSIMM
    Thirty years since Moura No.2 – so what has changed?

    By D I. Cliff

    The loss of 11 miners in the 7 August 1994 Moura No.2 Underground Mine Disaster was the catalyst for major change in the way safety was managed in the Australian Mining Industry. The impact was felt a

    Apr 16, 2024

  • AUSIMM
    Iron RoadÆs Prediction of Magnetite Concentrate Production from the Central Eyre Iron Project

    By P J. Marsh, P J. Bartsch, N J. Semler

    Iron Road Limited is currently studying the feasibility of producing 20 Mt/a of high-grade (67 per cent Fe) magnetite concentrate from a 2.6 Bt resource (JORC) located at Warramboo on the central Eyre

    Aug 12, 2013

  • AUSIMM
    The Energy Equation-Coal

    This paper covers only the energy uses of natural resources and does not deal with non- energy uses, which in 1975 were of the order of 10 per cent of the total consumption of energy resources. The

    Jan 1, 1978

  • AUSIMM
    Footwall Stability at the LKAB's Kiruna Sublevel Caving Operation, Sweden

    By C DahnTr-Lindqvist

    The Kiruna mine produced about 19 Mt processed iron ore in 1999 using sublevel caving. General failure in the hangingwall has been widely studied and its mechanism is rather well understood. Failure i

    Jan 1, 2000

  • AUSIMM
    The Simple Facts about Sampling Gold Ores

    By T Day, I G. Robertson, G J. Lyman

    "Various approaches are used in the industry for establishing procedures (sample mass estimation and method of subsampling) for sampling and analysis of gold ores. The key factors that determine the a

    Oct 10, 2016

  • AUSIMM
    Maximise Orebody Value through the Automation of Resource Model Development Using Machine Learning

    By S Oliver, D Willingham

    "Although a resource model is central to the mineral resource value estimation process (Glacken and Snowden, 2001), creating it is a labour intensive task and in the end it is a limited representation

    Jun 15, 2016

  • AUSIMM
    Oxidation of Pyrite by Ferric Iron in the Acidic Berkeley Pit Lake, Montana, USA

    By J P. Jona, S R. Poulson, C H. Gammons

    Spatial and temporal trends in water chemistry in the acidic (pH ~2.6) Berkeley Pit lake, Butte, Montana, can be explained by a newly developed iron-cycling model. Key elements of this model include:

    Jan 1, 2003

  • AUSIMM
    Site Water Balance Response to Variable Climatic Conditions

    By S Hawker, M Gibbs, A Craven

    Current climate change projections suggest both an increase in the intensity of significant rainfall events and an increase in the variability of rainfall in some regions of Australia. It is necessary

    Nov 26, 2013

  • AUSIMM
    Paving the Future - A Case Study Replacing Truck-and-Shovels by Shovel-and-Conveyor Continuous Mining at Carajas Open Pit Mines

    By C T. Senra, A Souza

    Increasing fuel prices, unavailabilty and high prices of tyres have imposed tremendous challenges for large open pit operations. Carajßs open pit mines, one of the largest iron ore projects in the wor

    Jan 1, 2009

  • AUSIMM
    The Future of the Tasmanian Mineral Industry

    The future of the Tasmanian mineral industry can only be estimated from a knowledge of the past, and armed with this knowledge an orderly plan for the future can be developed. Brief mention is made

    Jan 1, 1977

  • AUSIMM
    Impact of Initiation Mode of Explosives on Energy Release Characteristics

    By P K. Singh

    Recent advancements in understanding the detonation process are noteworthy, but they are still based on somewhat hypothetical situations. The actual variables that are essential parts of normal blasti

    Nov 8, 2011

  • AUSIMM
    Scenario-based Project Evaluation – Full Mineral Value Chain Stochastic Simulation to Evaluate Development and Operational Alternatives

    By S Coward, S Jackson, S Moayer, J E. Vann

    The variability and uncertainty of mineralisation, coupled with subsequent uncertainty in mining and processing, is often paid scant regard or overlooked during the evaluation of mining projects. In m

    Aug 18, 2014

  • AUSIMM
    Processing of Magnetite Iron Ores - Comparing Grinding Options

    By A Jankovic, D David, P Payne

    Although the majority of current steel production is supported by iron ore sourced from high-grade haematite deposits, the long-term growing demand for steel has led to higher raw material prices and

    Jan 1, 2009

  • AUSIMM
    Large Compact Bucket Wheel Excavators

    Most compact bucket wheel excavators in use are in the small to medium range. Large compact bucket wheel excavators compete directly with con- ventional longer boom excavators which have operational

    Jan 1, 1989

  • AUSIMM
    Supergene Iron Ore and Disorder

    By F R. M Pires, R M. Carvalho

    Supergene processes in banded iron formation (BIF) result in important dissolution, material transport and simultaneous disorder of the residual bands. The rock physical properties such as density, po

    Jan 1, 2002