Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Bowen Basin Coalmine Spoil Classification for Improved Mine Rehabilitation OutcomesBy T Baumgartl, J Burgess, B Emmerton, P D. Erskine
Large-scale open cut mining in the Bowen Basin has been undertaken for over 40 years. During this period, improved mechanical capability and economics have allowed extraction to greater depths, result
Jun 28, 2016
-
The Development of Heavy Suspension Techniques for High Density Sink-Float Separations (Replacement of ClericiÆs Solution)By S McKnight, L Koroznikova, S Hall
Mineral sands represent an important new resource being developed in the Murray Basin, including parts of western Victoria. This paper will outline a simple methodology for mineral sands characterisat
Jan 1, 2006
-
Reductive Leaching of Manganese Containing Material with Pyrite in a Mild Sulphuric Acid MediumBy Parida K. M, Paramguru R. K
Laboratory-scale studies aimed at developing a process for solubilising manganese values from a low grade pyrolusite containing material using low grade pyrite, both available in India, are described.
Jan 1, 1995
-
Mineral Resource Policy Issues for Sustainable Development: Corporate and National Imperatives (e3355e4c-7484-44c3-ab2f-95b2e231f322)Constraints on the mineral industry are best treated as issues that have to be understood and managed in partnership rather than in conflict with communities. The Zapopan development at Mt Todd in
Jan 1, 1995
-
The Use of Psychometric, Thermodynamic and Transport Property Software in Mine Ventilation and Gas Drainage CalculationsBy T J. M Harvey
This paper gives an overview of the ASHRAE LibHuAirProp, CoolProp and REFPROP software packages. These packages were predominantly developed for heating, refrigerating and air conditioning engineers a
Aug 31, 2015
-
Behavior of Minor Elements in the Roasting of Zinc ConcentrateBy Kato T, Eguchi M, Seino T, Itagaki K, Kimura T, Muto T, Shimizu T, Kobayashi T
Behaviour of minor elements in the dust collecting system connected with fluidized bed roaster for zinc concentrate was investigated by use of the bench scale experimental appara- tus. The dust col
Jan 1, 1980
-
Deployment of Self - Contained Self Rescuers in Coal MinesBy Baafi EY, Sun Y, Tague I
Field trials at three New South Wales and one Queensland coal mines were carried out to gather data on oxygen "run out" times of Self-Contained Self Rescuers (SCSRs), time taken to escape from the min
Jan 1, 1998
-
Pike River Coal - Hydraulic Mine Design on New Zealand's West CoastPike River Coal Limited is in the process of developing the Pike River Coal Mine in the Paparoa Ranges of New ZealandÆs South Island. The mine will be developed to extract a coking coal deposit of the
Jan 1, 2006
-
The EMESRT Approach to Equipment Design - Bringing End Users into the PictureThe Earth Moving Equipment Safety Round Table (EMESRT) was established by mining companies in 2006 to influence manufacturer's equipment design through a process of engagement. 2010 EMESRT member
Dec 6, 2010
-
Contemporary Criteria of Open Pit Long-Term Production SchedulingProduction scheduling of open pit mining is a key area as it deals with the management of operating cash flows of mining companies. The efficiency of long-term schedules is usually assessed with econo
Sep 26, 2011
-
Ceramic Vacuum Filters - The Australian ExperienceThis paper outlines the advances made in vacuum filtration as developed by Outomec Process Filters and details the results obtained at a number of Australian installations. The first section of the
Jan 1, 1991
-
Life Cycle Based Water Footprints of Selected Mineral and Metal Processing RoutesBy N Haque, S Northey
Water in mining, mineral processing and metal production on a life cycle basis has been at the top of agendas for various industries, government agencies, research organisations, academic institutions
Nov 26, 2013
-
Developing and maintaining mine site ventilation capability and new trends in mine ventilation career pathsBy D J. Brake
The importance of mine ventilation to health and safety in both coal and metalliferous mines has been long recognised. The primary and secondary ventilation systems in most metalliferous mines incur 5
Oct 12, 2022
-
Environmental Impact of the Imperial Smelting ProcessBy Bishop D. J
The Imperial Smelting Process for the simultaneous production of zinc and lead is probably regarded by the ecologist as a necessary evil with the benefits of its products marginally outweighing the
Jan 1, 1993
-
Project Controls for Large Mining Projects - The Client's PerspectiveControl of construction projects is the responsibility of the Project Leaders who have the authority to make decisions. Project Controls cost and scheduling systems provide the Leaders with timely inf
Jan 1, 1993
-
Adaptation of Hydraulic Shovels for Arctic Temperature of Yakutia RegionHydraulic mining shovels can be successively used at open-pit mining operation in severe climatic zone with air temperature interval from -700C to +450C typical for some northern region of the world p
Dec 6, 2010
-
People-An Employer's ViewRather like the mythical "Economic Man" "an employer" in this context must necessarily be an abstraction, and the views possessed by such an abstraction, a composite of many views known to have bee
Jan 1, 1982
-
Establishing the Design Parameters of a Control Blast for Long-term Stability of the Hang Wall at Rampura Agucha MineBy R Shrimali, P Rajmeny, L Shekhawat, A Joshi
Rampura Agucha open pit mine has successfully been excavated to a depth of 320 m, incorporating multistage working. The key to success is the implementation of presplitting as control blast measures a
Aug 24, 2015
-
Project Management for All Seasons ù Financial Risk Mitigation in a Challenging WorldBy O C. Aitken
Mining project developers are committed to taking on all the challenges and obligations of financial risk management. It is interesting that our current models of project finance have not changed mark
Jan 1, 2004
-
A Solution to Grade Estimation in a High Nugget Environment ù The Bendigo ExperienceIn a ætypicalÆ gold deposit each tonne of ore will contain tens of millions of very fine gold particles, whereas; at Bendigo the majority of gold in each tonne of ore is present in just five to 15 ver
Jan 1, 2004