An Analytical Approach For The Estimation Of Pillar Strength
A procedure fm the estimation of pilla1 strength is presented where the design of underground coal pillars is emphasized. An analytical approach has been developed, proposing that the effect of end co
Jan 1, 1990
-
Field Measurements of Chain Pillar Response to Longwall Abutment Loads
By Christopher Mark
Current longwall pillar design methods are based on many assumptions about pillar and entry response to longwall abutment loads. Knowledge of the magnitude and time-of-arrival of abutment loads is ess
Jan 1, 1986
-
Options to Control Groundwater-Based Georisks along Geological Faults in the Large Scale Area of Influence of an Open Pit Mine
By Markus Papst, Denise Millier, Daniel Beckers, Axel Preusse
"At an open-pit lignite extraction mine in Germany, groundwater has to be pumped over a large area, which leads to subsidence at the surface. As long as the geology of the area of influence is homogen
Jan 1, 2016
-
Estimation of in-situ material strength
By Danell. R. E.
A drill monitoring system has been developed which measures performance characteristics of a rotary drill and relates this to the material strength and rotary specific energy. The drill monitor is com
Jan 1, 1989
-
Mapping and Application of Roof Joint Patterns for Ground Control inAn Illinois Mine
By Kenny D. Basnett
An analysis of the Roof Falls Data Base (RFDB) for underground coal mines in Illinois for the period 2004?2008 indicated that about 80% of the roof falls occur at intersections and are associated with
Jan 1, 2011
-
A Case Study of a Low Overburden Longwall Recovery with Pre?Developed Recovery Entries
By John C. Stankus
The 3 Right pre-developed longwall recovery entry at Signal Peak Energy?s Bull Mountain No. 1 mine was designed to prevent the abnormal roof conditions encountered in its firsttwo recovery entries. Un
Jan 1, 2014
-
Prediction of First Weighting Distance in Longwall Coal Mining By 3D Numerical Modeling ? A Case Study
By Haile Manteqi
In longwall coal mines, estimation of roof strata condition, sequence of loading, and supporting requirements are of a high degree of importance, and they are directly related to production and safety
Jan 1, 2012
-
The Development and Planning of Multiple Level Underground Limestone Mines
By Bruce W. King, David A. Newman
"Underground mines have always been an integral part of the limestone industry. However, beginning in the 1990s, the number of underground limestone mines has increased for many reasons including• Str
Jan 1, 2016
-
Application Of Mechanical And Groundwater-Flow Models To Predict The Hydrogeologic Effects Of Longwall Subsidence - A Case Study
By Danny J. Van Roosendaal
An investigation was undertaken to determine hydrogeological effects of subsidence over a longwall coal mine in the Illinois Basin. At this mine, approximately 200 ft of bedrock overburden is overlain
Jan 1, 1995
-
The Use of Strata Management Techniques for the Optimisation of Secondary Support in Longwall Installation Roadways at United Colliery, NSW, Australia
By Kieran Black
The immediate roof lithology at United Colliery is extremely variable and provides a challenge for the design of secondary support. Support design in recent longwall installation roads at the mine has
Jan 1, 2007
-
Drivage System In Retreat Longwall Gateroad
By Kikuo Matsui
In a difficult economic environment, the coal mines in Japan have been making extensive efforts in order to survive by rationalizing the mining operations. Introduction of a new longwall mining system
Jan 1, 1995
-
Evaluation of a Multiple Seam Interaction Coal Pillar Bump
By Michael Gauna
An evaluation and analysis of a coal pillar bump in a West Virginia mine indicated that the pillar bump occurred because of the unique combination of controlling factors. The pillar?s development sta
Jan 1, 2008
-
Weightings And Water Inflows During Longwall Working
By I. W. Farmer
Weightings and water inflows into longwall workings often occur together, giving rise to discussions on their relative genesis. Case histories are introduced which indicate that most water inflows are
Jan 1, 1996
-
Tekcrete Fast®: Fiber-Reinforced, Rapid-Setting Sprayed Concrete for Rib and Surface Control
By Stephen C. Tadolini, Minova USA Inc., Peter S. Mills, David R. Burkhard
"Fiber-reinforced spayed concrete has been used for several years in civil and tunneling operations. Research conducted to reduce cure times and increase compressive and flexural strengths resulted in
Jan 1, 2017
-
Correlation Between Unconfined Compressive And Point Load Strengths For Appalachian Rocks
By Luis E. Vallejo
The strength measured by the uniaxial compression test is a parameter that is widely used for the engineering classification of rocks. Sedimentary rocks such as shales, however, are difficult to evalu
Jan 1, 1989
-
Interaction Subsidence In The Sydney Coalfield, Nova Scotia
By Peter Cain
The paper presents previously unpublished results derived from an unique interaction moitoring program conducted in the Sydney Coalfield of Nova Scotia. An abandoned, sealed longwall gateroad was r
Jan 1, 1996
-
Entry Stability Monitoring & Analysis For Longwall & Continuous Mining Systems
By Wm. Mark Hart
Under a specific geological condition, roof supporting method, and pillar-entry system, an entry convergence concept may be the most effective means that can be used to effectively indicate the longwa
Jan 1, 1995
-
Coal Bumps And Odd Dynamic Phenomena - A Numerical Investigation (70cea8ce-38a7-4c88-a596-77cf801d31b0)
By Jeffrey K. Whyatt
The Crandall Canyon accident investigation included an interesting and unexplained observation by rescuers that the ?barrier rib had shifted northward as a unit, as much as 10 feet.? This is not the
Jan 1, 2009
-
Five Stress Factors Conducive To Bumps In Utah, USA, Coal Mines
By Joe F. T. Agapito
High stresses and adverse geology in deep coal mines in the state of Utah, USA, have caused numerous bumps. The larger bumps have been associated with seismic events with Richter magnitudes of 3.6 and
Jan 1, 2000
-
Mining Geotechnical Benchmarking
By Vincent A. Scovazzo
Benchmarking is a business management process that seeks improvement through the study and reapplication of practices conducted by industry leaders. This discussion presents objectives and organizatio
Jan 1, 2000