Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Advantages And Limitations Of Adaptable Tunnel Design And Construction Methods
By Herbert H. Einstein, Edward C. Tse, David B. Ashley
INTRODUCTION Decision-making in the design and construction of underground facilities must be made under conditions of varying geologic uncertainty, uncertainty which can have a major cost impact i
Jan 1, 1979
-
Probability Techniques For Analyzing Open Pit Production Systems
By Randal J. Barnes
In, any open pit mine the ability to make accurate production estimations for the shovel-truck system is an important asset. This is true in an operating mine wishing to estimate production under a se
Jan 1, 1979
-
Rock Tunneling And Rock Excavation In New York City Methods, Problems, Innovations
By Morris Loshinsky, George Ziegler
The New York City Transit System is celebrating its Diamond Jubilee this year. In 1904, 9.3 route miles of New York's first subway was placed in operation in lower Manhattan. Since that date the
Jan 1, 1979
-
Shafts And Tunnels: Damen Avenue To Roosevelt Road
By William C. Paschen
Damen Avenue to Roosevelt Road, the Tunnel and Reservoir Plan (TARP), a Deep Tunnel Project for the Metropolitan Sanitary District of Greater Chicago consists of 25,189 lin. ft. of 32 ft. tunnel with
Jan 1, 1979
-
ARMCO Autometrics Particle Size Measurement And Control
By Albin E. Anderson
The PSM System has been available to the mining industry for nine years. During this time, many of the more than 160 Systems sold have been put to practical use and have provided the owners a handsome
Jan 1, 1979
-
Efficiency Sizing Of A Vibrating Screen
By V. K. Karra
An improvement in the present day screen sizing methods calls for knowledge on i) how material in the size range: 0.5 x 1.5 times the through-fall opening of the mesh on a deck, splits between the ove
Jan 1, 1979
-
Design And Construction Of Norad Expansion Project "Excavation Phase"
By Gerald G. Griswold, Allan G. Provost
INTRODUCTION The Norad Expansion Project was located 10 miles southwest of Colorado Springs, Colorado, within Cheyenne Mountain. The expansion areas to be excavated would be adjacent to the existin
Jan 1, 1979
-
OSHA And Its Problems
By Richard L. Daley
Today's subject of discussion, "OSHA AND ITS PROBLEMS", must be covered in the time allotted with a slight tongue in cheek approach, for if one is to believe that the "problems of OSHA" can be co
Jan 1, 1979
-
Coal Division - Underground Coal Mine Design and Planning ? Estimating Mine Pillar Strength From Compression Tests
By Louis A. Panek
Using an approach based on the theory of similitude, the author develops a general equation and related concepts that provide new insights to an old problem. The load-bearing capacity (strength) of a
Jan 1, 1979
-
Trends In Use Of Computers In Process Control
By D. L. Madge
The text of this chapter was not received in time for printing.
Jan 1, 1979
-
Stockpiling And Reclaiming Systems In Mill Design
By Michael J. Miller
In the design of a modem mill, a stockpile storage system for raw and/or semi-processed ore has become almost indispensable. This paper discusses the benefits of such stockpile storage as well as the
Jan 1, 1979
-
Recent Experience In Sewer Tunneling In The Oslo Area, Norway
By U. F. Beichmann
INTRODUCTION The City of Oslo together with the neighbor municipalities, Baerum and Asker, are presently building a jointly owned sewage treatment plant located on the west side of the inner Oslofj
Jan 1, 1979
-
4.1 Introductory Review ? Introduction
Computer applications in mine 'production' planning and control are concerned with the here and now. In production planning and control we are dealing with tactics as opposed to strategy. Ou
Jan 1, 1979
-
Two Underground Hydroelectric Power Plants In East Africa
By Gunnar Sparrman, Börje Ahlgren, Sten Rosenström
Starting in 1967 two major hydroelectric power projects have been implemented in East Africa viz. Kafue Gorge in Zambia and Great Ruaha in Tanzania. The two projects have similar characteristics and e
Jan 1, 1979
-
Tunnel Boring Machine Instrumentation
By Larry Snyder, Levent Ozdemir, Charles Fishman, Fun-Den Wang
Tunnel Boring Machine Instrumentation A 9.17 m. diameter tunnel boring machine presently in operation in Chicago, Illinois, has been instrumented to continuously monitor and record machine thrust,
Jan 1, 1979
-
5. Computer-Based Microseismic Monitoring of Rock Burst Prone Areas ? Introduction
By Jon T. Langstaff
The microseismic method of detecting instability and high-stress zones in underground mines was first developed in this country by the US Bureau of Mines in the early 1940's (Obert and Duvall, 19
Jan 1, 1979
-
4.2 Short-Range Mine Planning - 1. Interactive Short-Range Mine Planning - A Case Study - Concept Of Mine Planning Function At Cyprus Pima
By L. R. Nelson
Cyprus Pima is a medium-sized open-pit copper mine located 35 km (22 miles) south of Tucson, AZ. The ore body was discovered using geophysical prospecting methods in 1953 and was originally worked as
Jan 1, 1979
-
Field Measuring System For Cable Tunneling Construction
By Osamu Shoji, Mamoru Kato
In order to continue improving the quality of telecommunication services to meet the expectations of the people and to increase reliability in the case of emergency such as disasters, Nippon Telegraph
Jan 1, 1979
-
Observation Of Construction Behavior Of A Major Rock Tunnel
By Edward S. Plotkin, Joseph D. Guertin
In a continuing effort to upgrade tunnel design and construction practice, the New York City Transit Authority sponsored a geotechnical monitoring program on a recently completed section of the E. 63r
Jan 1, 1979
-
The Current Status Of The Gag Island Nickel Laterite Project
By Virgil R. Huff, Ihor Havryluk
P. T. Pacific Nikkel Indonesia (PTPNI) was incorporated in Jakarta, Indonesia in February, 1969 by a group of Dutch and North American companies. At the same time, a Contract of Work with the Governme
Jan 1, 1979