Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    Ground Freezing for Deep Shaft Excavation Shaft 18B-1 New York City Water Tunnel No. 3 New York, New York - NAT2024

    By Andrew Chegwidden, Tara Wilk

    Shaft 18B-1 is the second shaft to be constructed as a part of contract C547A along the New York City water supply system Tunnel No. 3. More complex than Shaft 17B-1, this site has an additional 30 m

    Jun 23, 2024

  • SME
    Contractual Practice in SEM/ NATM—Tunnelling in Austria and Germany - NAT2024

    By Lukas Erkurt, Wolfgang Holzer, Stefan Auderer, Richard Gradnik

    SEM/ NATM Tunnelling contracts in Austria and Germany are usually tendered applying unit price contracts. The purpose of this paper is to show how contractual problems are resolved in these countries.

    Jun 23, 2024

  • SME
    Fabrication and Installation of Americas First Post Tensioned Pre-Cast Segmental Tunnel Liner - NAT2024

    By Madeline Mello, Michael Low, Nick Karlin, Bryce Scofield

    The LA Effluent Outfall Tunnel is the first tunnel in the United States to incorporate post- tensioning into the precast segmental lining. Several unique components were integrated to ensure that the

    Jun 23, 2024

  • SME
    Repair of a Failed Reinforced Concrete Adit Tunnel with Carbon Fiber Wrap - NAT2024

    By Daniel Willis, Ryan O’Connell

    An 8-foot tall horseshoe adit tunnel located within an abutment of the Mount Morris Dam in Mount Morris, NY required repair of a failed reinforced concrete liner. The adit tunnel is entirely founded w

    Jun 23, 2024

  • SME
    Risk-Based Ventilation Design for a Long Bidirectional Road Tunnel - NAT2024

    By Reinhard Gertl, Soroush Dabiri, Juan-Carlos de Rueda

    The Tunnel of Guillermo Gaviria Echeverri, spanning 6.05 miles, will be Latin America’s longest road tunnel, is currently under construction in Colombia’s Antioquia Department with a single bidirectio

    Jun 23, 2024

  • SME
    Chimney Hollow Reservoir Project Inlet/Outlet Tunnel Excavation and Valve Chamber Construction - NAT2024

    By Kyle Kittle, Kyle Knaeble, Albert Ruiz, Gregory Raines, Ryan Gewargis

    The Chimney Hollow Reservoir Project (CHRP) is located southwest of Loveland, Colorado. CHRP is a component of the Windy Gap Firming Project, operated by the Municipal Subdistrict of the Northern Colo

    Jun 23, 2024

  • SME
    Tunnel Belt Applications for Long Distance Tunnels with Curvy Alignments - NAT2024

    By Marco Sonnenschein

    Belt conveyors for tunnelling are industry standard and key to high performance of TBM drives. Conveyors reduce traffic in the tunnel and increase safety in the tunnelling process. This paper will ill

    Jun 23, 2024

  • SME
    Secant Pile Wall as Support of Excavation and Final Lining of a Major Underground Metro Station - NAT2024

    By A. Bhargava, V. Nasri

    Traditionally, secant piles have been utilized to provide temporary support during excavation for shafts and cut-and-cover tunnels. As an alternative, the secant piles can be included into the permane

    Jun 23, 2024

  • SME
    Ground Freezing with Liquid Nitrogen for TBM Cutterhead Maintenance - NAT2024

    By Joseph Sopko, Xavier Lacourse-Dontigny

    For the REM (Réseau Express Métropolitain) project, a 2500 m tunnel was built using a tunnel boring machine (TBM) under the Montreal Pierre Elliott Trudeau Airport (ADM). Although the geology under th

    Jun 23, 2024

  • SME
    Shaft Design and Construction at the Hampton Roads Bridge-Tunnel - NAT2024

    By Richard Giffen, Martha Gross, Luca Pellegrini, Pa Ousman Njie

    The Hampton Roads Bridge-Tunnel (HRBT) Expansion project in Virginia includes parallel 1.5- mile (2.4 km) tunnels constructed using a tunnel boring machine (TBM). The TBM launching and receiving shaft

    Jun 23, 2024

  • SME
    Optimization of Fire Design for FRC Tunnel Segments - NAT2024

    By Nader Shahcheraghi, Verya Nasri, Mehdi Bakhshi, Ali Haghighat

    An accidental fire load is one of the major loads considered in design of segmental linings in transit tunnel. Typically, a two-dimensional coupled thermo-mechanical finite element analysis (FEA) is c

    Jun 23, 2024

  • SME
    TBM Breakthrough in Pressurized Conditions—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Fabrizio Fara

    As part of the Ship Canal Water Quality Project, 2.7-mile Combined Sewer Overflow tunnel is excavated with a 21.5-foot diameter EPB Tunnel Boring Machine. Due to the difficult geological and hydrogeol

    Jun 23, 2024

  • SME
    Parallel Thimble Shoal Tunnel: Challenging TBM Assembly and Launching in an Existing Island - NAT2024

    By Ruben Piqueras, Juan Luis Magro, Jorge Vázquez, Santiago Martínez, Xavier Manjarín

    The Parallel Thimble Shoal Tunnel project involves the construction of a bored tunnel under Thimble Shoal Channel in Chesapeake Bay (VA), between two artificial islands and parallel to the existing tu

    Jun 23, 2024

  • SME
    Unique Aspects of Remote High Altitude Water Tunnel Repair - NAT2024

    By David Jurich, Ed Perko, Jacob Prezkuta

    Numerous Colorado mountain tunnels that date to the late 1800s convey water to the farming and urban communities of the eastern Front Range. Repairs to these remote facilities, often located in public

    Jun 23, 2024

  • SME
    Restoration And Reclamation In Two Utah Mining Districts: Park City And Bingham Canyon (Kennecott) - SME Annual Meeting 2022

    By D. Symonds, A. J. Richins, M. G. Nelson

    Mining activities at Kennecott and Park City are similar in that both districts began operation in the last half of the 18th century, and both operated on a large scale for many years. However, they a

    Mar 2, 2022

  • SME
    Assessing The Impact Of A Residential Metals Abatement Program On Child Blood Lead Levels In Butte, Mt - SME Annual Meeting 2022

    By C. Van Landingham, A. Bailey, R. A. Schoof

    A residential metals abatement program has been underway in Butte for more than 20 years. More than 1,350 yard and attic cleanups were completed by the end of 2018; most triggered by lead. While the f

    Mar 2, 2022

  • SME
    Use Of Amino Acids For Copper Dissolution - SME Annual Meeting 2022

    By C. Perea, O. Restrepo, C. Ihle, H. Estay

    In this study, research on the use of monosodium glutamate for copper leaching, with emphasis on the thermodynamics and oxidant characteristics, is presented. Copper dissolution was conducted followin

    Mar 2, 2022

  • SME
    Evaluation Of Parameters Influencing Potential Gas Flow To The Mine In The Event Of A Nearby Unconventional Shale Gas Well Casing Breach - SME Annual Meeting 2022

    By S. J. Schatzel, K. M. Ajayi, Z. Khademian

    The integrity of unconventional shale gas well casings positioned in the abutment pillar of a longwall mine could be jeopardized by longwall-induced deformations. Under such scenarios, the surrounding

    Mar 2, 2022

  • SME
    Hot Surface Ignition Of Liquid Fuels Under Ventilation - SME Annual Meeting 2022

    By L. Yuan, J. Soles, D. Bahrami, W. Tang, R. Thomas

    Mine equipment fires remain as one of the most concerning safety issues in the mining industry, and most equipment fires were caused by hot surface ignitions. Detailed experimental investigations were

    Mar 2, 2022

  • SME
    Gas Source Discrimination Methods To Identify The Occurrence Of A Hypothetical, Unconventional Gas Well Breach Into A Nearby Longwall Mine - SME Annual Meeting 2022

    By E. Watkins, S. J. Schatzel, K. Ajayi, V. Gangrade

    The National Institute for Occupational Safety and Health (NIOSH) has been conducting research related to unconventional gas wells positioned in abutment pillars associated with active longwall mining

    Mar 2, 2022