Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    Second Narrows Water Supply Tunnel—Final Design, Procurement and Construction - RETC2021

    By Gregg W. Davidson, J. Andrew McGlenn, Frank Huber

    The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet the long-term needs of a g

    Jun 13, 2021

  • SME
    Mechanized Tunneling in Flowable River Sands—The TBM Drives of the Annacis Island WWTP New Outfall System - NAT2022

    By John Newby, Edward Kennedy, Ulf Gwildis

    Alluvial deposits of major rivers often provide relatively uniform tunneling conditions. However, these conditions pose specific challenges due to the tunneling behavior of the granular soils as flowi

    Dec 1, 2022

  • SME
    Analysis of Near Field Vibration Monitoring in Construction Blasting - NAT2022

    By Jim Buckley, Ryan Sibley, Scott G. Giltner, Thomas Pallua, Joe Schrank, Robert Cidlik

    Because of variation in rock type and site conditions, it is important to create site-specific prediction models for peak particle velocity (PPV) and understand instrumentation mounting locations to b

    Dec 1, 2022

  • SME
    Tunnel Design Aspects for the New Haven Downtown Storm Sewer Infrastructure Improvement Project - RETC2021

    By Michael Schultz, Gregory Sanders

    The City of New Haven is proposing to construct Downtown Storm Sewer Infrastructure Improvement project to mitigate on-going stormwater flooding in the Long Wharf District. The proposed project includ

    Jun 13, 2021

  • SME
    Application of Surrogate Modeling for SEM Tunneling Simulation

    By Christophe Bragard, Marte Gutierrez, Haotian Zheng, Michael Mooney

    This paper proposes a framework for applying surrogate-based approaches to evaluate SEM construction, which can both benefit the uncertainty analysis in the design stage and real-time calibration duri

    Jun 13, 2021

  • SME
    Long Distance Tunnelling: Challenges and Trends - NAT2022

    By Karin Bäppler

    Mechanized tunnelling is undoubtedly one of the most innovative disciplines in the international construction industry. Technological progress in the planning and production of most modern infrastruct

    Dec 1, 2022

  • SME
    TBM Breakthroughs in Pressurized Conditions—Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) and Northeast Boundary Tunnel (NEBT) Projects - NAT2022

    By Francesco Chiappalone, Filippo Azzarà, Raffaele Aliberti, Daniele Nebbia, Lance Waddell

    As part of the 3RPORT and NEBT Projects, 5-mile Combined Sewer Overflow Tunnels were excavated with a 19 ft diameter Slurry and 26 ft diameter EPB Tunnel Boring Machines. Due to the difficult geologic

    Dec 1, 2022

  • SME
    Flow Control in Tunnels - NAT2022

    By Darold Woodward, Stefan Haydn, Petr Pospisil

    Most fatalities in tunnel fires are caused by the spread of toxic smoke. Controlling the spread of smoke is crucial to provide a survivable environment for emergency egress. A properly designed and tu

    Dec 1, 2022

  • SME
    Laboratory Study of Clay Clogging Issues for EPB TBM Tunneling Applications - RETC2021

    By Jamal Rostami, Wei Hu

    Efficient performance of EPB TBMs in clayey ground is primarily dominated by the flow capability of the excavated muck in the cutterhead and screw conveyor. Currently, Consistency Index approach is us

    Jun 13, 2021

  • SME
    A New Era of Tunneling Planned for Houston—Going Deep to Solve Regional Water Supply, Wastewater, and Drainage Problems - RETC2021

    By Eric Hansen, Todd Wanless, Chris Mueller, Shannon Dunne, Scott Elmer

    Between 2010 and 2018, Houston added more than 1 Million residents; the third largest rate of growth in the nation. With growth, the region faces new challenges with water supply, capacity of its wast

    Jun 13, 2021

  • SME
    Effect of Muck Transportation System on Overall TBM Performance and Downtimes - RETC2021

    By J. Rostami, P. P. Nelson, A. Khetwaln

    Tunnel boring machines (TBMs) can be considered as the method of choice for tunneling in many projects due to the high level of efficiency and high potential productivity, safety, and applicability in

    Jun 13, 2021

  • SME
    Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021

    By David Mast, Irwan Halim, Seung Han Kim

    Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,

    Jun 13, 2021

  • SME
    Keep ’Em Separated—Managing Contract Interfaces for the Westerly Storage Tunnel (WST) - NAT2022

    By Ryan P. Sullivan, Ben D. DiFiore, Robert J. Auber, Michael A. Piepenburg, Lisa M. Smiley

    Pollution to Lake Erie will be significantly reduced by the Westerly Storage Tunnel (WST) system, which is mainly comprised of a 10,000-ft long tunnel and a dewatering pump station in the downstream t

    Dec 1, 2022

  • SME
    Tunnel Lining Design in Active Fault Zone: Case Histories and Innovations - RETC 2021

    By Peter Chou, Pooyan Asadollahi, Danny Lin

    To maintain flexibility and ductility of tunnels crossing active faults, various mitigation measures are being utilized depending on fault offset movements and seismic design criteria. Examples of tho

    Jun 13, 2021

  • SME
    Back on Track: The Downtown Rail Extension - RETC2021

    By Meghan M. Murphy, Derek Penrice

    The Downtown Rail Extension (DTX) is principal element of the planned second phase of the Transbay Joint Powers Authority’s (TJPA) Transbay Program. When complete, this regionally critical project wil

    Jun 13, 2021

  • SME
    Unreinforced Slurry Walls as Temporary Support of Excavation for Shafts - RETC2021

    By Arash Dahi Taleghani, Pooyan Asadollahi

    Slurry walls, also known as diaphragm walls, are commonly used as temporary and/ or permanent support of excavation for construction of shafts in soft ground. Through case history, this paper demonstr

    Jun 13, 2021

  • SME
    E-Power Pipe®: Two-Stage Trenchless Method for Long Drives in Small Diameters - NAT2022

    By Peter Schmäh, Tobias Engel

    The E-Power Pipe technology was originally developed for the trenchless installation of protective pipes and pipelines of 10" to 28" diameter, over long distances of more than 4,000 ft. The twostage p

    Dec 1, 2022

  • SME
    The Machine Within a Machine: TBM Innovation in Vancouver, British Columbia, Canada - NAT2022

    By B. Catalano, D. Ifrim

    The Annacis Island Outfall Project includes two TBM bored tunnels with face pressures above 3.5 bar, with an internal diameter of 4.2 metres. This paper discusses the innovative approach to TBM tunnel

    Dec 1, 2022

  • SME
    Pre-Excavation and Early Work Activities for the Long Baseline Neutrino Facility Far Site - RETC2021

    By Josh Willhite, Seth Pollak, Ben Seling

    The Long Baseline Neutrino Facility Far Site at the Sanford Underground Research Facility in Lead, South Dakota will house four large detector tanks located in deep underground caverns. Construction o

    Jun 13, 2021

  • SME
    Advance Rates in Soft Ground Tunnelling - RETC2021

    By Dan Ifrim

    Soft ground tunneling poses major challenges to the underground industry. Most of soft ground tunnels are in highly urbanized areas, often include limited cover, and include a strong trend of increasi

    Jun 13, 2021