Plant and process startup of the Sunshine silver refinery
By J. B. Ackerman, C. S. Bucans
The Sunshine Mining Co. has recently started up its new silver refinery in Kellogg, ID. The new plant recovers silver anc copper values from a high grade tetrahedrite concentrate using hydro- metallur
Jan 1, 1987
-
Instrumented flexibly-lined loading pocket
By J. F. Abel, R. J. Spengler
Convergence measurement across the 17.4-m (57-ft) high shaft station/loading pocket at Mt. Taylor provided continuing verification of stability and safety. Three levels of instrumentation, consisting
Jan 1, 1987
-
Economic factors of industrial minerals production
By H. S. Kibler, A. E. J. Gallagher, J. J. Sebesta
A review will be made of the nature, value, costs, and factors associated with industrial minerals production in general. Comparisons will also be made between some of these data and similar criteria
Jan 1, 1987
-
In situ leaching of disseminated gold deposits - geological factors
By J. G. Wargo
In situ leaching of disseminate gold deposits has been studied from a theoretical perspective to outline the operating environment for the process. Rock permeability and the relationship of permeabili
Jan 1, 1987
-
Applied drilling and blasting techniquesfor blast casting at Trapper mine – Potential to save on overburden removal
By Paul D. Dupree
Introduction Trapper mine is a dip-line strip coal mine, located about 10 km (6 miles) southwest of Craig, CO. The mine provides the Craig Generating Station, operated by Colorado-Ute, with about
Jan 1, 1987
-
Subsidence of bedrock above abandoned coal mines in Illinois produces few fractures
By R. A. Bauer
Investigations of bedrock within subsided areas over abandoned coal mines in Illinois reveal very little disturbance of the bedrock. In areas that have surface subsidence of 0.3 to 1 m (1 to 3.25 ft),
Jan 1, 1987
-
Advances in characterization of adsorbed layers and surface compounds by spectroscopic techniques
By P. Somasundaran, J. T. Kunjappu
Spectroscopic techniques are becoming increasingly popular for characterizing the interior of adsorbed layers of surfactants and polymers at solid- liquid interface as well as in the identification of
Jan 1, 1987
-
Heap Leaching Recovery Rates Vs. Heap Height a Case Study at Alligator Ridge Mine, Nevada
By R. A. Womack, Alex Ruzycki
Over the past six years, 4.5 million tonnes (5.0 million short tons) of gold ore have been heap leached at the Alligator Ridge Mine. Ore is leached in successive lifts, resulting in heap heights of 20
Jan 1, 1987
-
Industrial Minerals And Rocks Of Arizona
By H. Wesley Peirce
Arizona embraces portions of two major western-U.S. physiographic-geologic provinces and a smaller, local one. These exert fundamental control over the geologic framework and associated earth-material
Jan 1, 1987
-
FMC Paradise Peak - an update
By C. I. Wilmot
The paper presents an update of the Paradise Peak mill after the first year of operation. Process revisions, equipment modifications and additions, and personnel requirements are discussed with a comp
Jan 1, 1987
-
Economic and environmental comparison: borehole mining versus conventional mining of phosphate
By J. A. Hrabik
The feasibility of mining deep phosphate deposits by a borehole mining system was compared with mining by proven conventional techniques. An economic comparison of the borehole mining system with conv
Jan 1, 1987
-
Isolation and preservation of bacterial cultures with special reference to leaching of Indian copper ores
By A. D. Agate
In developing nations, novel mineral processing methods like bacterial leaching are gaining prominence. The principles and practices for isolation and preservation of cultures used in bacterial leachi
Jan 1, 1987
-
Parsimonious models of grinding and their applications
By P. C. Kapur
The hierarchical relationship between three broad kinds of grinding models for a spatially homogeneous, linear, time-invariant batch grinding system are first established. Limiting and asymptotic argu
Jan 1, 1987
-
Crusher for critical size material at Los Bronces semiautogenous grinding plant, Chile
By O. Fernandez, M. Vesely
Abrasive grinding, leading to ultrafine product and "critical size" material buildup inside the mill, is proposed as the cause of high power consumption and low capacity in many fully autogenous grind
Jan 1, 1987
-
Kidston gold mines startup
By D. A. Knight, V. G. Medina
Kidston's 14 000 t/d mine and mill complex in Queensland, Australia, started operation in January 1985. During its first 18 months of operation, the mine produced over 7000 kg (225,000 oz) of gol
Jan 1, 1987
-
Use of liquid phase tracers in material balance calculations
By A. J. Neale, B. C. Flintoff
A relatively inexpensive and reliable method of using liquid phase tracers to aid in the solution of material balance problems is introduced. The method is of value in situations where one is required
Jan 1, 1987
-
Degradation process in coal slurry pipelines
By M. G. Ayat, B. C. Scott
Coal degradation is the breakage of coal particles to finer sizes due to the continuous forces of attrition and gravity to which coal is subjected during mining, handling, and preparation. The objecti
Jan 1, 1987
-
Structural Analysis Of Mine Pillars Using Finite Element Method ? A Case Study (33d11900-f541-447c-9266-57bec509d8a1)
By D. H. Y. Tang
3-dimensional finite element modeling was performed to analyze the safety factors of stump pillars, 18 ft. x 18 ft., under a cover of 208 ft. using the Modified Drucker-Prager Theory. The results show
Jan 1, 1987
-
Stress Relief To Control Coal Bursts
By K. Y. Haramy
Deep coal mines with strong roof and floor rock frequently encounter face and rib bursts. The burst problem is becoming more severe as mining depth increases, prompting efforts to relieve high stress
Jan 1, 1987
-
SO2 abatement in a 440-kW pilot-scale combustor - limestone injection tests
By G. H. Lewis, C. L. Krcil, N. S. Harding, D. E. Havekotte
INTRODUCTION Limestone injection work was completed in a 440-kW (1.5-million Btu per hour) pilot-scale combustor in preparation for a 50,000-kg/h (110,000-lb per hour) industrial steam boiler lime
Jan 1, 1987