Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Planning and Design of the Bay Tunnel
By Johanna I. Wong, R. John Caulfield, Victor S. Romero
The existing Hetch Hetchy water system, owned and operated by the San Francisco Public Utilities Commission (SFPUC), serves 2.4 million people within the San Francisco Bay Area. The system has existin
Jan 1, 2007
-
Planning and Designing For Mining Conservation
By David B. Brooks, Roger L. Williams
Control of the environment is as old as mining. Engineers have always had to consider how best to deal with the surface, and the character of the surface environment always affects mining method in so
Jan 1, 1973
-
Planning And Development Of The Deserado Mine - Rangely, Colorado
By Don L. Deardorff
The Deserado Mine and transportation system is the fuel supply portion of the Bonanza Power Plant project. Deserado Mine con¬sists of an underground mine with a capacity of 1,224,700 tonnes (1,350,000
Jan 1, 1984
-
Planning and Fast Track Tunnel Design in Historical Downtown Charleston
By James McKelvey, Larry Drolet, Jason Swartz
INTRODUCTION When divers discovered that sections of a tunnel housing the pipeline that conveys wastewater from the Charleston Peninsula to the Plum Island Wastewater Treatment Facility had caved
Jan 1, 2005
-
Planning and Preliminary Design of the North-South Bypass Tunnel, Brisbane, Australia
By Tony Peglas, Harry Asche, Eva Wood
The North-South Bypass Tunnel is a new $AUD1.5 billion underground traffic route in Queensland, Australia, a project of the Brisbane City Council. The tunnel is approximately 5.2 km long, bypassing th
Jan 1, 2005
-
Planning And Preparation For Tunneling At Brightwater West
By Mina M. Shinouda
Brightwater West (BT4) represents the state of the art in utility tunneling, namely a long relatively small diameter, soft ground tunnel, with no intermediate shafts, under significant groundwater pre
-
Planning And Teamwork Lead To Successful Start-Up At Batu Hijau
By P. Hickey, J. Spenceley, T. J. DeMull
Development of the Batu Hijau Project was successfully completed in the fourth quarter of 1999 with the final handover and start-up of ore processing facilities. The development project had started m
Jan 1, 2001
-
Planning Belt Conveyer Networks Using Computer Simulation - Introduction
By C. B. Manula
The application of computers to materials handling problems has recently been investigated by various mining groups. This approach has been found, especially useful where a large amount of alternative
Jan 1, 1967
-
Planning Considerations For Quartz Hill Mine Southeast Alaska
By K. M. Reim
Planning the development of the Quartz Hill molybdenum open pit mine in Southeast Alaska required a number of special considerations. Located in mountainous glaciated terrain, about 3.8 m (150 in.) of
Jan 1, 1988
-
Planning Economics of Sublevel Caving
By Dan Nilsson
INTRODUCTION There are many mine planning factors in sublevel caving, as in the other mining systems, which when varied can substantially alter mining costs and profit¬ability. In this chapter, the f
Jan 1, 1982
-
Planning For An Integrated Mine Graphics System
By J. E. Taylor
A detailed planning and design project has been undertaken at Callide Coalfields, as the first step towards implementing a fully integrated mine graphics system. The system, when fully installed, will
Jan 1, 1986
-
Planning For Coal Gasification - Supplement to Tables VII and VIII providing additional data
By Ralbern H. Murray
Typical First Year Selling Price Strip Mined Western Sub-Bituminous Coal Based [Fixed Capital (1) $600 MM Construction Loan Interest $100 Working Capital $ 30 Start-up Costs $ 30 Total Capit
Jan 1, 1975
-
Planning For Common Mineral Resources: A Computer Simulation Approach
By William A. Wallace
Common mineral resources (sand, gravel, crushed stone, etc.), which are so necessary for the construction of metropolitan areas, are rapidly being depleted or otherwise rendered unavailable in the ver
Jan 1, 1968
-
Planning for Emerging Technology Underground Connection Between Rancho Cucamonga Metrolink Station and Ontario International Airport
By Mike Wongkaew, Brandon Kluzniak, Per Vilhelmsson
Rail access to Ontario International Airport (ONT) has long been a goal of San Bernardino County Transportation Authority (SBCTA) to increase public transit options to ONT and provide incoming ONT pas
Dec 1, 2022
-
Planning For Operating Excellence
By E. Fidler
A recent headline in the Wall Street Journal declared, "trendy management schemes very often fail." Many of the management techniques addressed in the accompanying article are associated with quality
Jan 1, 1994
-
Planning for Sound Transit’s Proposed LINK Light Rail Expansion in Seattle Washington - RETC2023
By Matthew Preedy, Anthony Pooley, Mike Wongkaew, Dirk Bakker, Raghu Bhargava
Sound Transit’s ST3 program will add 62 miles of light rail to the Puget Sound area, including connections to the neighborhoods of West Seattle and Ballard. These connections include considerations fo
Jun 13, 2023
-
Planning for State-of-Good Repair, Hazard Mitigation, and Resiliency for San Diego County Water Authority’s 2nd Aqueduct Water Supply Infrastructure - RETC2023
By Paul Taurasi, Mahmood Khwaja, Anjuli Corcovelos, William Brick
California’s San Diego County Water Authority provides a safe and reliable water supply to more than 3.3 million residents through twenty-four member agencies. The 2nd Aqueduct pipelines, a critical i
Jun 13, 2023
-
Planning for Subsidence at Rend Lake, Illinois
By Larry Powell
Rend Lake is an Army Corps of Engineers reservoir located in Franklin and Jefferson Counties in south-central Illinois. The lake consists of 20,000 acres of water and 19,000 acres of public access lan
Jan 1, 1986
-
Planning For Sustainable Land Use Management In Surface Coal Mining Areas
The present contribution examines the main components of a sustainable land reclamation program applicable to surface coal mines and the environmental threats that hinder the transition to sustainable
Jan 1, 2003
-
Planning for the Drumanard Highway Tunnels, Kentucky
By Lawrence Williamson, Randall J. Essex, David P. Field
As part of a $2.2 Billion bridge project that will link Indiana and Kentucky, an interchange project northeast of Louisville will require the mining of a 6-lane tunnel system about 2,000 ft long in or
Jan 1, 2005