Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimizing the Performance of Vertically‐Mounted Jet Fans in Ventilation Shafts (Mining, Metallurgy & Exploration)
By ETHAN FUSTER, Richard Ray Jr, STEPHEN LEE
The abstract states that horizontally-mounted jet fans are commonly used to ventilate vehicular tunnels due to their space and cost savings compared to fully ducted systems. It highlights the successf
Mar 16, 2022
-
Optimizing The Siting And Grading Of Leach Pads
By S. J. Taylor
The siting, grading and fill usage for leach pads are important aspects of leach pad design. A method is presented that optimizes the cut and fill quantities (i.e. minimizes the cost) required to grad
Jan 1, 1996
-
Optimizing The Value Of A Sample
By Gustavo G. Pilger, Jair C. Koppe, João Felipe C. L. Costa
Information for mine planning requires to be close spaced, if compared to the grid used for exploration and resource assessment. The additional samples collected during quasi-mining are frequently loc
Jan 1, 2002
-
Optimizing Truck and Haul Road Economics
By M. David Monroe
Getting the best match between truck and haul road requires examining the cost effects of many factors. Most mines use a bottom line measure based on cost per ton of material moved. This measure focus
Jan 1, 1992
-
Optimizing Truck And Haul Road Economics (5fcf97a8-f2f5-450a-adfd-a1ffc956870d)
By M. D. Monroe
Getting the best match between truck and haul road requires examination of many factors and their effect on the bottom line. Most mines use a bottom line measure based in some way on cost per ton of m
Jan 1, 1992
-
Optimizing Truck-Loader Matching
By W. Morgan, D. Gove
In truck and shovel operations, productivity and cost per ton are influenced by the system matching choice, Optimization involves a balance of the size and number of trucks, the size and type of loadi
Jan 1, 1995
-
Optimizing Truck-Loader Matching Using Fleet Production And Cost To Optimize Truck-Loader Match
By D. Gove
All mining operations using trucks have a common need to properly match the number and size of hauling units (trucks. wagons. scrapers. etc.) to a loading unit (wheel loader. hydraulic shovel/excavato
Jan 1, 1994
-
Optimizing Tunnel Boring Machine And Cutter Design For Greater Boreability
By G. L. Dollinger, W. H. Hamilton
INTRODUCTION Design and development of new products generally proceeds through a phase of initial development and discovery based on the evolution of existing arts, followed by technical innovation
Jan 1, 1979
-
Optimizing Usage Of Installed Size Reduction Power At Minera Peñasquito
By S. Dixon
The Peñasquito deposit in Mexico is one of the largest grassroots precious metal discoveries developed in recent years. Goldcorp Inc. acquired the gold-silver-lead-zinc property with the acquisition o
Jan 1, 2012
-
Optimum auxiliary fan location to control air recirculation
By Ajit Godbole, Ping Chang, Ramakrishna Morla, Purushotham Tukkaraja, Shivakumar Karekal
This paper presents the results of a study on the optimum auxiliary fan location to control air recirculation in dead-end workings where diesel-powered vehicles operate. Investigations were conducted
Jul 1, 2023
-
Optimum Auxiliary Fan Location to Control Air Recirculation (Mining, Metallurgy & Exploration)
By Ajit Godbole, Ping Chang, Ramakrishna Morla, Purushotham Tukkaraja, Shivakumar Karekal
This paper presents the optimum auxiliary fan(s) location to control air recirculation in dead-end workings where dieselpowered vehicles operate. Investigations were conducted with various secondary f
Oct 18, 2022
-
Optimum Cement Quarry Scheduling Algorithm
By Kadri Dagdelen, M. Waqar Asad
Cement production involves the processing of raw materials that contain - Si02, A1203, Fe203, CaO, MgO, LOI (loss of ignition), S03, K20, Na2O, Ti02, P2055 and Cl- to produce the synthetic mineral mix
Jan 1, 2002
-
Optimum Chain Pillar Design at the Deepest Multi-Seam Longwall Workings in India Mining, Metallurgy and Exploration
By Nilabjendu Ghosh, Satyendra Kumar Singh, Gautam Banerjee, Harshit Agrawal
High-production methods like longwall mining with hydraulic powered supports are necessary to increase underground coal production in India. Longwall mining had a mixed success record for Indian geo-m
-
Optimum Chain Pillar Design at the Deepest Multi-Seam Longwall Workings in India Mining, Metallurgy and Exploration (c1221f6a-70cf-4429-9a4d-13a3e324a05a)
By Nilabjendu Ghosh, Satyendra Kumar Singh, Gautam Banerjee, Harshit Agrawal
High-production methods like longwall mining with hydraulic powered supports are necessary to increase underground coal production in India. Longwall mining had a mixed success record for Indian geo-m
-
Optimum Charcoal Loading Calculations And Other Developments To A CIP Circuit
By D. J. Collins
While the charcoal in pulp (CIP) process was introduced to the mining industry many years earlier, it did not gain widespread recognition until 1973 when Homes take Mining Company installed a CIP circ
Jan 1, 1989
-
Optimum Design Of Mining Structures
By S. J. Jung
The stability of underground openings for deep mines is critical, since incorrect orientation or geometry of shaft, stope, and accessways often results in the failure of openings due to high stress co
Jan 1, 1994
-
Optimum Drilling And Blasting Procedures
In some 35 years in the explosive and construction industries, we have probably seen the extremes in drilling and blasting practices. All of you know that it is difficult if not impossible, to separat
Jan 1, 1986
-
Optimum Duration For Bioheap Pretreatment Of Refractory Sulfidic Gold Ores
By Robert W. Bartlett
Pretreatment of sulfidic refractory gold ore by biooxidation in coarse-crushed ore heaps is a promising new technology, especially for low-grade ores that cannot afford pressure leaching or roasting.
Jan 1, 1995
-
Optimum Fragmentation In Underground Mining
By Kai Nielsen
In underground mining coarse muck and large boulders lead to ineffective utilization of costly mining equipment, and extra expenses and delays caused by secondary blasting. Cost analysis in some Norwe
Jan 1, 1986
-
Optimum Methane Drainage In Gassy Coal Mines
By P. C. Thakur
In gassy coal mines, some methane drainage is essential for mine safety, but the ratio of total methane drained to total methane produced by the mine can vary from 10 to 70 percent. The volume of met
Jan 1, 2003