Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Black Mountain overview: The resolution of the lands unsuitable petition from legal and technical perspectivesBy M. M. Rajkovich, L. Adams, J. J. Zaluski, S. Gardner
In 1998, a group called Kentuckians for the Commonwealth filed an Administrative Petition with the Kentucky Natural Resources and Environmental Protection Cabinet to designate 8,903± hm2 (22,000± acre
Jan 1, 2002
-
Black Mountain – An Overview - The Resolution Of The Lands Unsuitable Petition From The Legal And Technical PerspectivesBy M. M. Rajkovich, L. Adams, J. J. Zaluski, S. Gardner
In 1998, Kentuckians for the Commonwealth filed an Administrative Petition with the Kentucky Natural Resources and Environmental Protection Cabinet to designate 8,903 +/- hectares (22,000 +/- acres) o
Jan 1, 2000
-
Black River Tunnel project phase 1: Innovative quality control approach for installation and testing of rock bolts in shaftsBy J. Edberg
"This article details the use of an alternative testing method to the 2004 "Post-Tensioning Institute (PTI) Recommendations for Prestressed Rock and Soil Anchors" manual’s recommendations for temporar
Jan 1, 2014
-
Black Thunder Mine Planning And The Environment ? IntroductionBy Hugh W. Evans
Many reports and papers have been delivered on projects under construction or already in operation, but we believe there are few that have been written about projects yet to be built specifically deal
Jan 1, 1975
-
Blasor – A Generalized Strategic Mine Planning Optimization ToolBy B. Law, M. Menabde, B. Baird
Blasor is a new mine planning tool which is being used in the long and medium-term optimization of multi-open-pit operations throughout BHP Billiton’s Base Metals and bulk commodities portfolio. It i
Jan 1, 2007
-
Blast casting at an Eastern strip mineBy R. R. Rollins
Field data combined with theoretical derivations were used to design a surface mining operation using explosive casting. Calculated casting results varied from 44% to 65% depending on bench height. Th
Jan 1, 1988
-
Blast Casting At An Eastern Strip Mine (b31012bf-2fc9-4254-a7e6-574a95628df1)By R. R. Rollins
Field data combined with theoretical derivations were used to design a surface mining operation using explosive casting. Calculated casting results varied from 44 to 65% depending on bench height. T
Jan 1, 1987
-
Blast Fragmentation Model Evaluation Via Image AnalysisBy Martin L. Smith, John M. Kemeny
In blasting, an optimal muckpile size distribution can be found in terms of mining and milling productivity and cost. Fragmentation control requires a means of modeling and evaluating blast results. A
Jan 1, 1993
-
Blast Furnace Comparison Of Agglomerated Vs Sized Ore ? IntroductionBy Kan Aketa
The Japanese iron and steel industry has been developed remarkably, supported by the increase of steel demand. In particular, progress in various technical aspects of the ironmaking process, including
Jan 1, 1982
-
Blast Furnace Test Of Pelletech Cold Bond PelletsBy M. Adnan Goksel
A blast furnace test of approximately 5,000 tons of PelleTech Corporation (PTC) cold bond pellets was successfully run at Kaiser Steel Corporation (Kaiser) Steel Manufacturing Division at Fontana, Cal
Jan 1, 1979
-
Blast Furnace Testing Of The Reclaform Process (68bfc139-0269-44e6-b4a1-0ce63f13831f)By J. S. Young
During 1975, the Reclasource Corporation constructed and commissioned a plant for the recovery of mill scale, coke breeze, blast furnace dust, blast furnace sludge and basic oxygen furnace dust at the
Jan 1, 1977
-
Blast Hole Drill Recorder UtilizationBy T. E. Scartaccini
A drill recorder is a permanent data collecting instrument. In open pit blast hole drilling the application of a drill recorder is that of data collection, drilling control, and drilling education.
Jan 1, 1970
-
Blast Parameters for the Nagagami Hydro-Electric Project Tailrace Plug Blast, Utilizing Long Round Jumbo TechnologyBy Joseph Keenan
In March of 1994, Dynatec Mining Limited entered into a contract with PCL Civil Constructors to carry out the underground excavations for the Algonquin Power Corporation’s15 Megawatt Nagagami hydro-el
Jan 1, 1997
-
Blast-Induced DustBy Jozef Szymanski, Julian Partyka, Jerzy Krynicki
In order to study blast-induced dust in a hard rock metal mine experimentally and analytically, a part of a stope mined by Vertical Retreat Mining (VRM) was monitored throughout its lifetime. Dust mea
Jan 1, 1997
-
Blast-induced rock damage and optimized blast design in a hard-rock mine - SME Transactions 2014By K. M. Kim
An analysis was conducted to determine the effects of blasting on slope stability and downstream comminution processes. To investigate these effects, the extent of blast-induced rock damage and the ma
Jan 1, 2014
-
Blast-Induced Rock Damage and the Optimized Blast Design in a Mine: A Case StudyBy K. Kim
An analysis was conducted to determine the effects of blasting on slope stability and downstream comminution processes. To investigate these effects, the extent of blast-induced rock damage and the ma
Feb 23, 2014
-
Blast-Induced Rock Fragmentation in Wet Holes Mining, Metallurgy and ExplorationBy Hesam Dehghani, Farid Alimohammadnia, Nima Babanouri, Mokhtar Kalhori
In open-pit mining, blasting pattern design is performed to achieve a desired degree of fragmentation for loading, hauling, and crushing operations. Inappropriate fragmentation of rock will result in
-
Blast-Induced Rock Fragmentation in Wet Holes Mining, Metallurgy and ExplorationBy Hesam Dehghani, Farid Alimohammadnia, Nima Babanouri, Mokhtar Kalhori
In open-pit mining, blasting pattern design is performed to achieve a desired degree of fragmentation for loading, hauling, and crushing operations. Inappropriate fragmentation of rock will result in
-
Blast-Induced Rock Movement Measurement For Grade ControlBy Ananta L. Yennamani
Blast movement measurement (BMM) transmitters are a practical method to measure three-dimensional (3D) rock movement because of blasting. The BMM transmitters are activated, programmed and installed i
Jan 1, 2011
-
Blasted Ore Losses and Mineral Reserve: Reconciliation Approaches and Impact on Stope Performance - Mining, Metallurgy & Exploration (2021)By Marcel Laflamme, Sebastián Ibarra‑Gutiérrez
Improvement on controlling the stope limits has enabled the assessment of technical performance in several underground mining operations. Technical performance, integrated to stope geotechnical and ge
Aug 9, 2021