Deep Diaphragm Walls And Bored Piles For Subway Construction At The Amsterdam Central Station
By Wolf-R. Under
For improvement of urban traffic infrastructure, the City of Amsterdam is currently constructing the 9.5 km long North-South Metro line passing through the central districts of Amsterdam. Focal secti
Jan 1, 2006
-
Slurry Trench Design and Construction in Difficult Conditions
By Peter Deming
"PART 2 OF 2 (CONTINUED FROM SUMMER 2006 EDITION) CONSTRUCTION ISSUES (cont’d) The Influence of Ground Conditions on Collapse Sand and gravel strata provide frictional resistance to support active ear
Jan 1, 2006
-
Sonic Drilling Offers Quality Control And Non-Destructive Advantages To Geotechnical And Construction Drilling On Sensitive Infrastructure Sites
By John P. Davis
The use of conventional, circulatory air rotary and fluid rotary, cased and uncased drilling methods in the vicinity of sensitive infrastructure can have deleterious effects on the ground conditions s
Jan 1, 2006
-
Case History - Augered Cast-In-Place Piling Installed Into Weathered Sandstone
By Edwin W. Meyer
The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560
Jan 1, 2006
-
Man - Organisation - Technology - Proposals For Optimising Preventive Work
By Walter Ensinger
Working safely means working cost-effectively. Every "dangerous occurrence" and - even more so - every industrial accident causes disruptions in the planned course of construction. Besides moral and l
Jan 1, 2006
-
Stress And Deformation Of Pile Foundation Of Sutong Bridge
By Yin Zongze
The pile foundation of Sutong bridge pylons is an extra large pile foundation. The length of piles is 115m, and the diameter of the piles is 2.5-2.8m. Since the traditional design method may not deter
Jan 1, 2006
-
Prediction Of Settlement Of Structure With Piled-Raft Foundation Using Nodular Piles
By Koichi Kobayashi
Performance-based approach to design of structures including foundations was adopted after enforcement of the revised Building Standard Law in Japan in 2000. The use of piled-raft foundation is favora
Jan 1, 2006
-
Self Drilling Soil Nail Systems To Retain Caving Soils
By Ali Porbaha
The use of soil nailing technology as a cost effective alternative for excavation support and slope stabilization has substantially increased in the United States during the last decade. For example,
Jan 1, 2006
-
Application Of Global Strain Extensometer (Glostrext) Method For Instrumented Bored Piles In Malaysia
By Abdul Aziz Hanifah
A novel instrumentation and analysis technique, called GLOSTREXT method has recently been introduced for bored pile load tests in Malaysia. This technique provides an innovative and improved alternati
Jan 1, 2006
-
United States Capitol Visitor Center - Drilled Shafts, Utility Conflicts, And Communication
By Giovanni A. Bonita
The United States Capitol Visitor Center (USCVC) is one of the largest underground structures ever constructed in the Washington, DC, metropolitan area. The 600,000 ft2 (55,750 m2) structure is entir
Jan 1, 2006
-
Deep Foundations In Karst - Lessons Learned From I-40 Corridor Widening In Knoxville, Tennessee
By James L. Vinson
Wilbur Smith Associates (WSA) has provided planning, engineering and construction oversight assistance to the Tennessee Department of Transportation (TDOT) for three construction projects intended to
Jan 1, 2006
-
Prediction Of Ultimate Pile Bearing Capacity Using Artificial Neural Networks
By Vahid Tajdar
The behavior similarity between pile and cone penetration test, has guided the researchers to use the CPT results in prediction of piles bearing capacity. In this article, artificial neural networks h
Jan 1, 2006
-
Experimental Investigation Into The Stress And Strain Development Around A Displacement Pile
By Jelke Dijkstra
This paper presents the results of model pile load tests in a photoelastic material. The soil in this test is represented by an assembly of photoelastically sensitive glass particles, which allows for
Jan 1, 2006
-
Recent Advances In Quiet & Vibration-Less Steel Pile Installation & Extraction
By Ray. K. Filip
The concept of installing a steel sheet pile retaining wall into the ground by "pressing" has resulted in the development of various equipment solutions over the last thirty years e.g. Taylor Woodrow
Jan 1, 2006
-
The Design And Formation Of Bored Displacement Piles - A United Kingdom Perspective
By David J. Baxter
Use of bored displacement piles has experienced significant growth in the UK piling market sector, largely due to their environmental advantages over other piling methods and through cost benefits. Bo
Jan 1, 2006
-
Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In Driving
By Hodjat] [Shiri
A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in
Jan 1, 2006
-
The Contest On The Prediction Of Capacity Of A Bored Pile Constructed Under Polymer-Based Slurry In Bangkok Subsoil
By Narong Thasnanipan
This paper presents the outcome of the contest on the prediction of the static axial load capacity of diameter 1.20m bored pile founded at 46m below existing ground. The test pile was constructed by w
Jan 1, 2006
-
Driven Piles In Glacial Deposits Exhibiting Time Dependent Capacity
By Upendra L. Karna
The pile capacity gain with time evaluated and implemented for the construction of the Route 21 Viaduct in Newark, NJ, U.S.A is discussed in this paper. The project consisted of the replacement of mor
Jan 1, 2006
-
CSM: An Innovative Solution For Mixed-In-Situ Retaining Walls, Cut-Off Walls And Soil Improvement
By Fabrice Mathieu
The Cutter Soil Mixing (CSM) provides a cost effective solution for the rapid construction of retaining and cut-off walls using new equipment developed from diaphragm wall cutter technology. CSM consi
Jan 1, 2006
-
Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.
By P. M. Wiltcher
The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high
Jan 1, 2006