Canada?s Unique Uranium Mining Industry
By Tim Gitzel
Thank you for your introduction, and thank you to the CIM for inviting me to make a presentation to you today. This is my first opportunity to report to you on the status of the Canadian uranium ind
May 1, 2003
-
Latest Development in Cathode Stripping Machines
By M. Schmidt, P. Nord, M. Larinkari
Cathode stripping machine technology has been developed significantly both in electrorefining (ER) and electrowinning (EW) applications in the last ten years. The main driver has been robotic cathode
Jan 1, 2019
-
Process for Integrating Surface Drainage Constraints on Mine Planning
By Les F. Sawatsky
Surface drainage, particularly mine closure drainage, must be properly considered during all stages of mine planning because it presents constraints that are critical to economic mine operation, minim
May 1, 2009
-
Urban Minerals ? Resources in Jeopardy or ? How to Turn a Difficult Economic Climate to Your Advantage
By G. R. Guillet
THE LATE Dr. D. F. Hewitt, Ontario's foremost authority on industrial minerals, was the first to point out the importance of urban minerals when he produced figures (Hewitt 1968) to prove that th
Jan 1, 1978
-
Teniente Converter- A Decade of Achievements at the Southern Peru Ilo Smelter
By E. Herrera Alarcón, L. Mariscal Samaniego
The Teniente Converter (wet charge type) was commissioned in august 1995 and was designed to smelt 744 tpd (metric tons per day) of dry copper concentrates. Its products are white metal (73% Cu) that
Jan 1, 2007
-
Northern Quebec’s Strange Lake Rare Earth Elements (REE) Deposit Rougher Flotation Study
By Neri Roux, Ross Gilders, Yemi Oyediran, Leo Cheung
Quest Rare Minerals Ltd. is developing their Strange Lake B Zone REE deposit located in Northern Quebec. An extensive batch bench scale testing program was launched to investigate open circuit rougher
Jan 1, 2014
-
Introduction of and Experience Gained With Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia (5fc42dae-6b1c-469d-926f-1a8ca2654f54)
On the 26th of June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19,000 m3 of saturated hydraulic fil
May 1, 2007
-
Central Steam-Heating in Winnipeg
By J. W. Sanger
The establishment of a central steam-heating system in Winnipeg and its inauguration in October, 1924, has attracted a considerable amount of attention. Not only does it excite the curiosity of the en
Jan 1, 1926
-
Rock Wool
By M. F. Goudge
ROCK wool, one of the most recent additions to the list of Canadian-made, insulating materials, is a soft, light, fibrous material consisting of interlaced, flexible, glassy fibres so exceedingly fine
Jan 1, 1936
-
Acidic Effluents, Their Production and Characteristics
By C. C. Walden, A. Bruynesteyn
"Chemical and biological aspects of the formation of acidic effluents from sulfide waste materials are discussed. Test procedures to determine the acid producing potential of waste materials, as well
Jan 1, 1980
-
A Large Blast at the Hidden Creek Mine
By W. R. Lindsay
Considerable attention has of late been given to the blasting of large amounts of ore in one operation, on account of the saving in labour and explosives and consequent low cost per ton, and also on a
Jan 1, 1934
-
Agglomeration heap leaching of precious metals
By J. A. Eisele, D. L. Pool
"The Bureau of Mines has developed a particle agglomeration technique to improve the flow of leaching solution through heaps of low-grade gold-silver ores which contain clays. Benchscale experiments a
Jan 1, 1987
-
Planning and Scheduling of Maintenance Work at the Milliken Mine
By K B. Bowley
This paper covers the application of a systematic maintenance plan by the Plant Engineering Department of Rio Algom Mines Limited, Milliken Division. The plan established the function of work study, d
Jan 1, 1963
-
Cyclones at East Malartic Mines Ltd.
By J. W. Keyes
"The original grinding circuit at East Malartic consisted of two 8 by 8 C.A.C. mills in closed circuit with two 72 inch Akins Classifiers and an 8 by 10 secondary mill in closed circuit with two 48 in
Jan 1, 1964
-
Ductile Fracture of AA2198 Aluminum-Copper-Lithium Alloys in the Aeronautical Industry
By J. Q. Chen
The elastic-plastic behavior and the fracture mechanisms of two 2198 Al-Cu-Li thin sheets are investigated. The first material (2 mm thick) is in a recrystallized state after cold rolling. The second
Jan 1, 2011
-
Geological and Hydrogeological Conditions for Forming Uranium Occurrences in the Froqlos-Jabal Abou Rabah Region, Palmyrides, Syria
By R. Al-Hent, M. Aissa, J. Asfahani
"This paper focuses on determining the favorable geological and hydrogeological conditions for forming uranium occurrences in the Froqlos-Jabal Abou Rabah region, Palmyrides, Syria. Eighty rock sample
Jan 1, 2009
-
Canadian Clean Power Coalition Project: The evaluation of options for CO2 extraction from existing and new coal-fired power plants
By D. du Plessis, R. Stobbs
The Canadian Clean Power Coalition (CCPC) was created in 2001 to protect and enhance Canada’s vast coal and other carbon-based resource wealth, and to ensure that environmental public policy decisions
Jan 1, 2006
-
Some Aspects of Shaft Sinking on the Witwatersrand
By Alan E. Gallie
FOR many years the Witwatersrand has been the leading gold mining r camp in the world and, to a Canadian mining student, could not fail to be of overwhelming interest. The vast scale upon which the op
Jan 1, 1937
-
Permitting, Construction and Commissioning of a New Slag Landfill at Boliden Harjavalta
By Esa Peuraniemi, Hanna-Leena Heikkilä
Boliden Harjavalta has been operating a copper flash smelter since 1949. Thus, in 2019, the smelter is celebrating its 70th anniversary of flash smelting. Slag formation is an integral part of the sme
Jan 1, 2019
-
The San Martin project: design and operating experience in the development of a 12,000 tpd gold heap leach mine in Central America
By Paul Hosford, Tim Haldane
"The paper describes the fast-track development of the project from feasibility study through to detailed design and construction, highlighting the process adaptations for handling sticky ore and wate
Jan 1, 2002