Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Roasting tn the Iron and Steel Industry

    By H. U. Ross

    ROASTING is usually thought of as a process in which finely crushed or ground ore is heated with air in a suitable furnace in which the ore is rabbled or agitated in such a way as to insure complete r

    Jan 1, 1961

  • CIM
    Roasting, Fluidized-Bed Separation, And Hydrometallurgical Treatment of Waste Tantalum Capacitor to Recover Purified Tantalum

    By H. Tokuichi, H. Ohta, K. Sato

    A physical separation technique of tantalum capacitors from waste print circuit boards is in a development phase in Japan. A tantalum capacitor consists of an exterior coating of resin (epoxy resin) m

    Jan 1, 2014

  • CIM
    Robotic Applications In Mining Process; A Small Investment And Great Profits In The Short Term

    By H. Salamanca

    Recently, the mining industry has become one of the leading target markets for the technology industry as they need to innovate in their productive processes in order to boost productivity, reduce ope

    Jan 1, 2007

  • CIM
    Robotic Mapping of Underground Drift Networks

    By Unal Artan

    It is well known in the robotics community that the ability to determine the position of vehicles in real time is a key enabling technology required for automation, traffic management, and to ensure s

    Oct 1, 2009

  • CIM
    Robotic systems development for mining automation

    By S. Flewelling, M. Scobie, G. R. Baiden

    "SynopsisA feasibility study to develop a research program, the Mine Automation Plan (MAP), was recently completed. This was undertaken by a team comprised of Inco Ltd., Falconbridge Limited, the Cana

    Jan 1, 1994

  • CIM
    Robotic Upgrading of Postwar Social Dwelling Envelopes

    By K. Iturralde

    The article discusses the possibility of automation in refurbishment processes of social dwelling built from 1950 to 1970. These massively produced buildings were mostly designed prior to the law enfo

    Aug 1, 2013

  • CIM
    Robotics and Automation for Oil Sands Bitumen Production & Maintenance

    By M. G. Lipsett

    General Challenges for Mining & Mineral Processing Operations ? Capital-intensive industry ? Ongoing cost pressures ? Remote locations ? Workforce demographics ? Dynamic, unstructured, rugged en

    May 1, 2008

  • CIM
    Robust image segmentation technique for rock fragmentation analysis

    By G. K. Mann

    Fragmentation analysis of blast or crushed rock material is a time-consuming and costly process. During the last two decades, the mining industry has been investigating image-based analysis systems as

    Jan 1, 2006

  • CIM
    Rock anchor support systems at Smoky River Coal Limited, Grande Cache, Alberta

    By R. F. Dawson, A. S. Bagnall, K. Barron

    "At Smoky River Coal Limited (SRCL), economic occurrences of structurally thickened coal deposits form attractive surface mining targets. These steeply dipping, structurally complex deposits require t

    Jan 1, 1995

  • CIM
    Rock anchor support systems at Smoky River Coal Limited, Grande Cache, Alberta (b00134fd-f294-4823-b57d-05c31c7f1dcd)

    By R. F. Dawson, A. S. Bagnall, K. Barron

    "At Smoky River Coal Limited (SRCL), economic occurrences of structurally thickened coal deposits form attractive surface mining targets. These steeply dipping, structurally complex deposits require t

    Jan 1, 1995

  • CIM
    Rock Bolting

    By H. J. Burchell

    "IntroductionTHE PURPOSE of this paper is to introduce the reader to rock bolting and its present application in mining.Rock bolting consists of bolting insecure rock to secure rock in order to form a

    Jan 1, 1955

  • CIM
    Rock Bolting Techniques and Applications for Gateroads in Fully Mechanized Top Coal Caving Face

    By Hongpu Kang

    The fully mechanized top coal caving mining method has been the main mining approach for thick coal seams with high output and efficiency in Chinese coal mines. The gateroads for the top coal caving m

    Aug 1, 2013

  • CIM
    Rock Breakage by Hydraulic Hammer: Comparative Study Between Scale Model in Laboratory and in Numerical Simulations

    The dynamic breakage process of rocks by the impact of a hydraulic hammer is more complex than one normally assumes. It is even more difficult when one has to conduct the breakage under water. In such

    Aug 1, 2013

  • CIM
    Rock burst Research at Lake Shore Mines

    By Ernest A. Hodgson

    WHEN excavations are made, at depth, in hard brittle rock structures, as in certain mines in India, in South Africa, and in Ontario, the pressure due to overburden, together perhaps with inherent geol

    Jan 1, 1945

  • CIM
    Rock Drilling with Tungsten Carbide Bits

    By J. H. Fulton

    Summary Considerable test work has been done with the detachable type of carbide bit. In general, these bits improved drilling operations, but at a bit cost .greater than was compensated for by the

    Jan 1, 1950

  • CIM
    Rock Engineering Design and the Evolution of Eurocode 7: The Critical Six Years to 2020

    By A. Perucho, J. P. Harrison, A. Bedi, L. Alejano, L. Lamas, A. Sofianos, A. M. Ferrero, R. Migliazza, R. Olsson, J-F. Mathier

    "In 2010, the Eurocode for Geotechnical Design, EN-1997-1:2004 (CEN, 2004), informally known as Eurocode 7 or EC7, became the Reference Design Code (RDC) for geotechnical design – including rock engin

    Jan 1, 2015

  • CIM
    Rock fall in surface mining

    By C. O. Brawner, J. Kalejta II

    "The classical approach to control rock fall and ravel in open pit mining has been to use catch benches. The width and volume of benches is most dependent on the bench height, size of loading equipmen

    Jan 1, 2002

  • CIM
    Rock fragmentation and the design of underground materials handling systems

    By G. D. Just

    "Extensive mechanization of underground mining operations, improvements in blasting technology and the development of simulation models for systems evaluation has now made it feasible to optimize rock

    Jan 1, 1980

  • CIM
    Rock Mass Change Monitoring in a Sill Pillar at Vale?s Coleman Mine (Sudbury, Canada)

    By Benoît Valley

    Optimization of the mining sequence in terms of economics (maximizing net present value) often leads to multi-front mining methods generating pillars. Significant resources are tied up in these pillar

    Jun 1, 2012

  • CIM
    Rock Mass Characterisation and Stope Design

    By Karina Forster

    Rock mass characterisation is a critical component of effective stope design. Unexpected excessive stope dilution or uneconomic stope sizes can be the result of rock mass characterisation that is not

    May 1, 2006