Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Evaluation of Phospho-Gypsum for Gypsum Products Manufacture

    By R. K. Collings

    "This paper summarizes research that was done at the Mines Branch, Ottawa, to evaluate samples of phosphogypsum for gypsum products manufacture. The samples were from phosphate fertilizer facilities a

    Jan 1, 1972

  • CIM
    Evaluation of Potash Dissolution by Inflow Brine Using Acoustic Emission

    By Fulchand Shende

    Around the world many potash mines experience brine inflow problems. The presence of brine in underground excavations may induce structural and stability problems. A study has been carried out to simu

    May 1, 2001

  • CIM
    Evaluation of Preg-Robbing in Goldstrike Carbonaceous Ore Using Raman Spectroscopy

    By M. M. Helm

    Samples sourced from the Goldstrike property in Nevada USA, have been evaluated in terms of their preg-robbing capacity and the physical structure of the graphitic carbon component in the carbonaceous

    Jan 1, 2011

  • CIM
    Evaluation of Pressures in Backfilled Stopes and on Barricades

    By Michel Aubertin

    Using mine wastes as backfilling material for underground stopes has been a common practice for more than 60 years. Waste rock and tailings are used as filling materials because they are available at

    Nov 1, 2008

  • CIM
    Evaluation of refractory brick classes for the Cerro Matoso S.A. electric furnace

    By L. Tejeda, J. R. Donald, R. Parra, J. Duran, P. H. Lauzon

    "Crucible slag tests were employed to evaluate different refractory brick classes for the Cerro Matoso electric furnace. Comprehensive analysis was conducted to evaluate the crucible erosion and chara

    Jan 1, 1999

  • CIM
    Evaluation of Results of Pumping Tests in Bedded and Jointed Sandstones

    By R. Druffel, P. Wittke-Gattermann, M. Wittke

    "The two tubes of tunnel Hirschhagen along the highway A44 in Germany, underpass the federal road B7, a railway line and the valley of the river Losse close to the city of Hessisch Lichtenau. The grou

    Jan 1, 2015

  • CIM
    Evaluation of Sampling in Geometallurgical Programs through Synthetic Deposit Model

    "The main purpose of geometallurgy is to develop a model to predict the variability in the mineral processing performance within the ore body. Geometallurgical tests used for developing such a model n

    Jan 1, 2016

  • CIM
    Evaluation of Scale Up Effect on High Pressure Grinding Roll (HPGR) Implementation at Pt Freeport Indonesia

    By G. Banini

    Prior to installation of High Pressure Grinding Rolls (HPGR) at PT Freeport Indonesia (PT-FI) a series of laboratory tests were carried out to determine the design parameters and also determine key pe

    Jan 1, 2012

  • CIM
    Evaluation of Scale up Effect on High Pressure Grinding Roll (HPGR) Implementation at Pt Freeport Indonesia (cdb77a25-01d8-4e23-be0d-f16f699bd6bc)

    By J. Mosher, G. Banini, J. Hollow, A. Villanueva

    Prior to installation of High Pressure Grinding Rolls (HPGR) at PT Freeport Indonesia (PT-FI) a series of laboratory tests were carried out to determine the design parameters and also determine key pe

    Jan 1, 2012

  • CIM
    Evaluation of Secondary Crushing Prior to SAG Milling at Newmont?s Phoenix Operation

    By G. M. Castillo

    Newmont?s Phoenix mine started production in March of 2006. Due to the extreme hardness of the ore, the mill has struggled to meet throughput projections. Grinding studies showed that optimizing the e

    Jan 1, 2012

  • CIM
    Evaluation of Secondary Crushing Prior to SAG Milling at Newmont’s Phoenix Operation (1c344a35-3b91-4668-a924-fecce9fcc553)

    By C. Bissue, G. M. Castillo

    Newmont’s Phoenix mine started production in March of 2006. Due to the extreme hardness of the ore, the mill has struggled to meet throughput projections. Grinding studies showed that optimizing the e

    Jan 1, 2012

  • CIM
    Evaluation of Shotcrete Rock Support Systems in Underground Mines by a New Non-Intrusive Technique

    By Moe Momayez

    Shotcrete is a practical and economical support system in many Canadian underground mines. Although shotcrete technology has gained acceptance in the mining industry, there are some problems that have

    May 1, 2001

  • CIM
    Evaluation of shotcrete rock support systems in underground mines by a new non-intrusive technique (33890d65-d377-415a-af90-fb1c64a61d2e)

    By F. Hassani, D. O’Donnell, M. Momayez, P. Guevremont

    Shotcrete is a practical and economical support system in many Canadian underground mines. Although shotcrete technology has gained acceptance in the mining industry, there are some problems that have

    Jan 1, 2002

  • CIM
    Evaluation of Specific Charge Parameter on Open-Pit Blasting

    By Abdurrahman Tosun

    It is very important for after blasting processes that muck pile fragmentation is predicted and controlled during blasting. Therefore, a significant research effort has been devoted to the development

    Aug 1, 2013

  • CIM
    Evaluation of Spent Alkaline and Zinc-Carbon Battery Recycling Using Ascorbic Acid, Activated Carbon and Guar Meal Reductants

    By S. Kursunoglu

    The aim of this study was to investigate the effectiveness of Ascorbic (C6H8O6) Acid (AA), Activated Carbon (AC) and Guar Meal (C6H12O6) (GM) as a reductant for the simultaneous complete dissolution o

    Aug 1, 2013

  • CIM
    Evaluation of Spiral Performance for Processing Iron Ore from the Carol Lake Deposit of the Iron Ore Company of Canada

    By G. Chung, W. Petruk, D. Doyle

    "A series of tests was conducted on Carol Lake iron ore, which contains about 38 wt % hematite and 19 wt % magnetite, to establish a flowsheet for high weight yield by spirals. A pilot plant was run i

    Jan 1, 1993

  • CIM
    Evaluation of spontaneous fire risk potential of underground coal mine panels

    By T. R. Roy

    "This paper presents an objective model for the estimation of fire risk potential of an underground coal mine panel by the bord-and-pillar method of mining where extraction is carried out by depillari

    Jan 1, 2003

  • CIM
    Evaluation of strainburst potential associated with excavation damage zone due to excavation method

    By Bo-Hyun Kim

    Outline ? Strainburst criteria and hypotheses adapted for this study. ? Influence of excavation method on rock mass properties. ? Excavation disturbance factors vs. deformation modulus, etc. ? Es

    Oct 1, 2010

  • CIM
    Evaluation of Strength, Microstructure and Consolidation Properties of Cemented Paste Backfill Using New Laboratory Equipment

    By Erol Yilmaz

    This poster presents results obtained from an experimental test set-up called CUAPS (curing under applied pressure system) allowing to assess the performance and quality of cemented paste backfill (CP

    Nov 1, 2008

  • CIM
    Evaluation of Tailings Material for the Preparation of a Low Modulus High Density Backfill for an Operating Mine

    By Dirige. A. P. E.

    A study was conducted for an operating mine to determine the appropriateness of its tailings material to be used for the preparation of a low modulus, high density backfill. The research was initiated

    Aug 1, 2013