Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    The Sovereign, Jubilee, Scotia and Jasper Creek Prospects, Waitekauri Valley, Hauraki Goldfield

    By J L. Mauk

    The Sovereign, Jubilee, Scotia and Jasper Creek prospects occur in an area of ~3.0 km by 2.5 km (~7.5 km2) in the Hauraki goldfield. The prospects are hosted by andesitic to dacitic flows, autoclastic

    Jan 1, 2005

  • AUSIMM
    Gas Phase Sulphation of Nickel Laterite Ores

    By Rankin W. J

    Increasing concern with the emission of sulphur dioxide from smelters and roasters has caused renewed interest in processes which can use waste sulphur dioxide, such as the sulphation of nickel late

    Jan 1, 1996

  • AUSIMM
    The Epithermal Au and Porphyry Cu (Au) Relationship in the Western Pacific and Central Europe (bacb76a9-dfc4-4704-8efd-2cd91a14adbe)

    By Carlie JC

    Many low sulphidation epizonal gold and zinc-lead vein deposits within magmatic arcs are situated on basement highs, and post-date both the main volcanic episode and porphyry copper (gold) mineraliza

    Jan 1, 1995

  • AUSIMM
    How to Obtain Cost-Effective Continuous High Production from TBMs

    By Jones A

    Today there is a vast amount of information available relative to the performance of tunnel boring machines, and associated systems. The data referred to here consists of project reports, manufacturer

    Jan 1, 1993

  • AUSIMM
    Estimating Mine Operating Costs - Trials and Tribulations

    The projection of operating costs for mining, processing, and other site operating costs is an exercise which can be fraught with considerable peril. Not only are the physical characteristics of eac

    Jan 1, 1990

  • AUSIMM
    Drill Blast Versus Reverse Circulation Grade Control Sampling ù A Case Study From the Mt Muro Gold Silver Mine, Central Kalimantan, Indonesia

    Mt Muro was a gold and silver mine in Central Kalimantan on the Island of Borneo, Indonesia. Aurora Gold through its Indonesian subsidiary Indo Muro Kencana owned the project. Processing commenced in

    Jan 1, 2003

  • AUSIMM
    Beneficiation Studies of Dolomitic Rock Phosphate in Pursuit of Zero Waste Technology - A Case Study

    Beneficiation Studies of Dolomitic Rock Phosphate in Pursuit of Zero Waste Technology - A Case Study

    Sep 13, 2010

  • AUSIMM
    Soil Washing and Bioremediation of Slime Dam Material from a Gold And Uranium Mine

    The solvent extraction section of an old Uranium Plant in the Vaal River region (North West Province in South Africa) produced a substance called CRUD (Chalk River Unidentified Deposit) that formed wi

    Jun 1, 2010

  • AUSIMM
    The Macraes Gold Mine Development of a Major Resource

    The Macraes Mining Company Limited was listed on the New Zealand and Australian stock exchanges in January 1990, and the proceeds of the float were used to purchase a 70 per cent interest in the Macra

    Jan 1, 1991

  • AUSIMM
    Optimising Grade Control Procedures in Large and Small Open Pit Mines

    By Khosrowshahi

    A scientific approach to analysing grade control has been applied at a number of mining operations. By dividing the grade control process into the various stages of data collection and interpretation,

    Jan 1, 1992

  • AUSIMM
    Potential for Revegetating Base-Metal Tailings at the Tui Mine Site, Te Aroha, New Zealand

    By P E. H Gregg, D Horne, R B. Stewart, N Bolan

    The Tui mine site is situated on the NW flank of Mt. Te Aroha, at approximately 400 m altitude. During underground mining operations two lead-copper-zinc ore bodies were exploited and processed on sit

    Jan 1, 1995

  • AUSIMM
    Long-Term Performance and Cost Benefit Analysis of Passive Acid Mine Drainage Treatment Systems Installed in the Appalachian Coal Region of the Eastern United States

    By J S. Simmons, J G. Skousen

    This project evaluated the performance of nine passive treatment methods by studying 137 treatment units in eight eastern states. Performance was normalised according to construction cost, projected s

    Jan 1, 2003

  • AUSIMM
    Modelling and Simulation of Cone Classifiers

    By Whiten WJ

    Although cone classifiers have received little attention in the modelling of mineral processing units they are one of the oldest non-mechanical classifiers. Their use has enjoyed a revival in recent

    Jan 1, 1993

  • AUSIMM
    Gold Placer Exploration Models: Inferences from Placers in the Waitaki River Catchment, South Island, New Zealand

    By J Youngson

    Gold placers can be difficult to locate in areas where tectonic activity and paleogeography have changed significantly since placer formation. Existing placer exploration models are useful in areas th

    Jan 1, 1999

  • AUSIMM
    Use of Ferro-Wastes in Sinter Making

    By P S. Datta, V N. Misra

    Higher bed height up to 680 mm, including 30 mm hearth layer of sized return sinter and high suction below the grate bars up to 1400 mm WG have resulted in increasing the productivity to a level of 33

    Jan 1, 2002

  • AUSIMM
    Flotation in the Minerals Industry ù Some Observations

    By J P. Moodie

    Recent trends in flotation technology are briefly reviewed. These show that considerable development has been made as the operators, suppliers and technologists have responded to the challenges of the

    Jan 1, 2005

  • AUSIMM
    Roasting - A Study on Environmental Aspects, Off-Gas, Effluents and Residue Treatment

    By M Runkel, J Hammerschmidt, A Holmstr÷m, A Charitos, J Gnntner

    "Roasting of sulfide concentrates and refractory ores is an important process step in the production of metals and chemicals. Sulfides of iron, zinc, copper and other metals are oxidised with air betw

    Sep 26, 2013

  • AUSIMM
    Dealing With Demands of Technical Variability and Uncertainty Along the Mine Value Chain

    By M Noppe, I Glacken

    There are many critical nodes along the mine value chain, from orebody to mineral product, and inter-disciplinary input is required to analyse the variability and uncertainty at each node in order to

    Jan 1, 2002

  • AUSIMM
    Linking the Values of Water to Sustainability

    The value of water is defined by its marginal utility. Challenges arise where the marginal utility is difficult to estimate. Therefore, when two or more interested parties wish to access water and the

    Jan 1, 2006

  • AUSIMM
    Building a Geometallurgical Model for the Canahuire Epithermal Au-Cu-Ag Deposit, Southern Peru - Past, Present and Future

    By M Dusci, A Trueman, S Poos, R Baumgartner, M Brittan

    The Canahuire epithermal Au-Cu-Ag deposit in southern Peru is a complex and challenging deposit for metallurgical studies. It has issues of gold locking in sulfides and non-sulfides, deleterious eleme

    Sep 29, 2013