Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Equipment Selection - What is the Issue? What About the Application of Simulation Packages?

    The selection of the mining fleet can have as much of an effect on the efficiency and effectiveness of an operation as the mining method. This is not to say that inefficiencies are only attributable t

    Dec 6, 2010

  • AUSIMM
    The Reaction of Ammonium Nitrate with Black Shale at Mt Whaleback

    By Bellairs P, Stewart JC

    On 20 December 1983 at 8.40am blast- hole 57 of Blast RN177 prematurely detonated follwed by a violent deflagration of blast- hole 59 at 10.40am. The blastholes were 380mm diameter drilled in black

    Jan 1, 1986

  • AUSIMM
    Earthquake Risk Assessment and Engineering Design - A Vital Consideration for the Pacific Rim

    By Boyce WH

    Earthquakes are the most frightening and devastating natural phenomena known to mankind. They strike without warning and their consequences can be disastrous in terms of the toll of human life, fi

    Jan 1, 1987

  • AUSIMM
    An Ecological Approach to Koala Conservation in a Mined Landscape

    By R Wheeler, E Stalenberg, J Lemon, M S. Crowther, D Lunney, K Ross

    Gunnedah, in north-western New South Wales (NSW), including the town, the surrounding Liverpool Plains and the Pilliga forests to the west, are currently the subject of intense mining interest for coa

    Jul 10, 2012

  • AUSIMM
    Human Resources Management at Grey River Gold Mining Limited

    Grey River Gold Mining Limited (GRGML) has constructed and largely completed the commissioning of an alluvial gold dredge designed to recover gold from a low grade gold deposit in the Grey River Valle

    Jan 1, 1989

  • AUSIMM
    Blast Vibration Monitoring and Elastic Wave Reflection Models to Assess Blast-Induced Damage to Mine Infrastructure - An Underground Case Study

    During underground mining, rock mass changes can occur as a function of the mining sequence and excavation processes. Mining-induced rock mass damage can occur due to redistribution of static stresses

    Dec 6, 2010

  • AUSIMM
    Site Investigation of Saline Gold Tailings Storages in Western Australia

    By M Fahey

    Large volumes of tailings are produced annually by the goldmining industry of Western Australia. This material ishydraulically discharged into large storage facilities usingsub-aerial deposition metho

    Jan 1, 2001

  • AUSIMM
    Monitoring and Predictive Modelling of Subsidence in the West Moreton Coalfield

    An ongoing research program into surface subsidence over Room and Pillar coal mining is described. A subsidence monitoring network has been established for one Room and Pillar mine in the West Mor

    Jan 1, 1986

  • AUSIMM
    Ore Block Design in Narrow Vein Gold Deposits – Estimate or Simulate?

    By G D. Matthews, M E. Haylett, S Khosrowshahi, A Weeks

    In narrow orebodies the use of ordinary kriging (OK) may pose certain limitations when used for grade control modelling. The smoothing effect of kriging, by its very nature, cannot retain or accuratel

    Aug 18, 2014

  • AUSIMM
    Managing the Mining Industry: World-Class Management for World-Class Performance

    Thank you and good morning. I am delighted to be here and to see so many of my colleagues and competitors. The general topic of this week's conference - World's Best Practice in Mining and

    Jan 1, 1995

  • AUSIMM
    Modern Hoisting System for Incline Haulage With Positive and Negative Slope

    By B OÆNeil

    The Trent-Severn Waterway is a 386 km long navigation route through central Ontario between Lake Ontario and Georgian Bay, and is operated by the Parks Canada Agency. Its primary focus is to pass recr

    Jan 1, 2005

  • AUSIMM
    The Geology of the Mesel Sediment-Hosted Gold Deposit, North Sulawesi, Indonesia (29cafc7f-df45-41c9-a3e9-70dac885efa7)

    By Lauricella P. F, Hendri D

    In the Mesel sediment-hosted disseminated gold deposit, the spatial distribution of hydrothermal alteration is controlled by steeply dipping faults and shallowly dipping lithologies. Hydrothermal alt

    Jan 1, 1995

  • AUSIMM
    Developing an Attractive Climate for Responsible Resource Development in a Socially-Sensitive Environment - The Victorian Experience as a Model

    By Jiricek F

    Legislative change has reformed the licensing process in Victoria. The Mineral Resources Development Act 1990 and the two stage system of licensing with the authority to commence work is discussed.

    Jan 1, 1997

  • AUSIMM
    Bit to Bag - The Importance of a Total Coordinated System in Reverse Circulation Drilling

    By M Goers, M Almond

    "The use of reverse circulation (RC) drilling for grade control sample collection was selected by the Pueblo Viejo Mine Geology department at the recommencement of the operation in 2010. This method w

    Aug 21, 2012

  • AUSIMM
    The Development and Implementation of a Three Dimensional Model of Blast Fragmentation and Damage

    By Cocker A, Kavetsky A

    A numerical model describing blast fragmentation and damage in three dimensions has been developed at the Julius Kruuschnitt Mineral Research Centre (JKMRC) and applied to numerous blasting operatio

    Jan 1, 1990

  • AUSIMM
    Wirralie Gold Mine A Case Study

    By Goode A, Belby P, Wardell-Johnson M

    Within a short time frame of just over two years Wirralie Gold Mine has been developed from a virgin geological discovery to an operating gold mine with a mine life of six years and a production r

    Jan 1, 1989

  • AUSIMM
    Geometallurgy – Beyond Conception

    By L O’Connor, S C. Dominy

    "Geometallurgy is an important addition to any evaluation project or mining operation. As a discipline, it seeks to maximise the net present value (NPV) of an orebody while minimising technical and op

    Jun 15, 2016

  • AUSIMM
    Process developments at Bouganville Copper Limited

    The original design of the Bougainville Copper Limited (BCL) concentrator took cognisance of the constraints imposed by the topography, the need to minimise capital cost, and the need to allow for pla

    Jan 1, 1986

  • AUSIMM
    Coal Reserves, Codes And Computers

    Conceptually coal reserve assessment is simple but in practice it presents many problems. These arise from the origin and geological history of coal seams and from the diverse nature of the coal it

    Jan 1, 1979

  • AUSIMM
    Primary Ore Milling at Pan Australian Mining Ltd Mt Leyshon Mine

    Pan Australian Mining lid installed a milling and gold leaching plant designed to process 2 million tonnes per annum of breccia sulphide ore. This plant was commissioned in January 1989. Since commi

    Jan 1, 1991