Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Shaft Guide Reactions at No. 2 Ore Shaft Mount Isa Mines Limited

    By Mercer J. K

    Shaft guide reaetions in No. 2 Ore Shaft, Mount Isa Mines Limited, have been reduced to a low order of magnitude by the use of self aligning slippers and spring loaded guide rollers. Before commission

    Jan 1, 1961

  • AUSIMM
    Developing Assessment Methods and Remediation Protocols for New Zealand Sites Impacted by Acid Mine Drainage

    By A Black, A de Jo, J Cavanagh, J Harding

    Acidic and metal-rich waters have been discharging from Sullivan Mine, West Coast, New Zealand since the closure of the mine during the early- 1990s. This has resulted in a decrease in pH from a backg

    Jan 1, 2003

  • AUSIMM
    The Multi-Element Functionality of the Whittle Optimiser - A Different Approach in the Evaluation of Iron Ore Deposits

    In general the iron ore industry has been slow to adopt the Whittle Pit optimising software in the evaluation of iron ore deposits. The reasons for this are two-fold:the iron ore industry has develope

    Jan 1, 2007

  • AUSIMM
    Mechanical and Electrical Maintenance as Practised in Mount Isa Mine Lead (No. 2) and Copper (No. 4) Concetrators

    This paper describes the mechanical and electrical maintenance activities as practised at Isa Mine. The principles of preventative maintenance adopted are described as well as the basis of mainten

    Jan 1, 1978

  • AUSIMM
    Beyond Mine-to-Mill - Circuit Design for Energy Efficient Resource Utilisation

    By A R. Bye

    Energy comes at great cost to our world and societies and therefore we should use it wisely and optimally. Societal pressure is enforcing this and the industry must respond by being proactive.The mine

    Jan 1, 2009

  • AUSIMM
    On Methods of Testing the Purity of High-Grade Lead

    In another paper the author described the electrolytic preparation of highly-purified lead. One of the most difficult parts, yet perhaps the most essential part, of that research was to ensure, first

    Jan 1, 1932

  • AUSIMM
    Isometric Mine Plans

    MR JOHN S Foxall wrote: Mr Clayton in his paper on the above subject (Proceedings, N.S. No. 34) made an assertion which should not be allowed to remain unchallenged. On the top of page 10 appears the

    Jan 1, 1920

  • AUSIMM
    Dewatering Open Pit Mines, Yilgran Craton, Western Australia

    Open pit mines in the Yilgam Craton have unique hydrogeological characteristics resulting from a combination of geology, mineralisation and the complex and extended development of the regolith. The pr

    Jan 1, 1993

  • AUSIMM
    The Managalase Volcanic Field and Associated Mineral Occurrences, Papua New Guinea

    The Managalase area is remote and little visited by geologists or prospectors. Yet it holds the key to the tectonics and petrology of this part of Papua. The eastern Managalase plateau (M, Figure 1) l

    Jan 1, 1999

  • AUSIMM
    The Hematite Ores of Mount Tom Price and Mount Whaleback, Hamersley Iron Province

    The ore deposits investigated are composed primarily of hcmatite and can be grouped into three categories depending on the amount of leaching of silica and carbonate which has occurred from the origin

    Jan 1, 1971

  • AUSIMM
    High-sulfidation Epithermal Cu-Ag-Au Deposit, Kluwih, Eastern Java, Indonesia – Alteration and Implications for Potential Porphyry Cu Mineralisation

    By J S-L Chan

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Cu-Ag-Au mineralisation at Kluwih prospect in Eastern Java, Indonesia is related to a high-

    Mar 18, 2015

  • AUSIMM
    Design of a Large-Scale Concentrator for Treatment of a Copper Skarn Orebody

    By T Hayward, G Lane, M Phillips

    In December 2004 Phu Bia Mining Ltd commissioned Ausenco International Limited to conduct a feasibility study for its Phu Kham copper-gold project located in Laos. The feasibility study for a mining a

    Jan 1, 2007

  • AUSIMM
    A Retrospective Examination of the Impact of a Resource Rent Taxation Scheme on an Australian Mining Company

    By Blackwood R. L, Crichton G. P

    In recent years, the value to Australia of the introduction of a system of resource rent taxation on the mining industry has been frequently debated. The forms that this rate of return based tax c

    Jan 1, 1979

  • AUSIMM
    Creating a Future for Australian Light Metals Through Vertical Integration

    AustraliaÆs strong position as an aluminium producer and potential magnesium producer combined with rapid market growth in the automotive industry, proximity to Asia and other natural advantages point

    Jan 1, 2000

  • AUSIMM
    Quantifying the Advantages of Improved Performance During Supply Disturbances of AC Pulse Width Modulation Drives for Winders Compared With Earlier Technologies

    By P Warner

    Mines are often located in remote areas that are not well served by æstiffÆ power grids. Radial transmission networks, high lightning incidence (eg in South Africa the Witwatersrand experiences seven

    Jan 1, 2005

  • AUSIMM
    Coal - Paper No. 12 Coking With A Seven Cubic Foot Capacity Coke Oven

    A new test coke oven of seven cubic foot capacity is described. The oven was designed to simulate conditions in a central section of a battery oven and a special feature is the achievement of unidi

    Jan 1, 1969

  • AUSIMM
    What’s Stopping You? The Role of Sheeting Material Selection in Safe Haulage Operations

    By R Thompson, D Tulloch

    "Wet-weather or 24×7 wet-trafficability is a commendable design objective for unpaved mine haul roads, but practically often difficult to achieve, due both to the road sheeting material selected, and

    Nov 15, 2016

  • AUSIMM
    Political and Social Aspects of Present and Future Tunnelling

    Our modern cities are almost incapable of sustaining themselves without subsurface infrastructure, which is not identifiable at first glance. This very soon becomes evident when the chaotic conditions

    Jan 1, 1999

  • AUSIMM
    Mining Operational Effectiveness ù A Large Open Pit Mine Case Study

    By M D. Kuruppu

    Fleet operational effectiveness is fundamental to any operation, becoming highly topical in mines experiencing less than optimal output from their fleets. It is an all encompassing aim to identify tho

    Jan 1, 2003

  • AUSIMM
    Low-Grade Concentrator Regrind Circuit Upgrade at NewcrestÆs Cadia Valley Operations

    By B Clements, R Dunne, J Dioses, S Hart

    In April 2003 plant upgrades in the æLow GradeÆ Cadia Hill circuit were undertaken in order to improve concentrate quality and metal recoveries from the flotation circuit. The major changes involved:

    Jan 1, 2005