Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Inpit Crushing System the Future Mining OptionIn-pit crushing systems have been known in the mining industry for many decades. The question whether in-pit crushing is a viable option has often been asked. More than 200 mobile and semi mobile crus
Jan 1, 2003
-
Resource-Reserve History of the Estero Hondo Alluvial Gold Mine, EcuadorFrom December 1994 to November 1997 Odin MiningÆs Estero Hondo alluvial gold mine in western Ecuador washed almost 3.2 million bank cubic metres of gravel to produce just over 2600 kilograms of pure g
Jan 1, 2003
-
Rare-Earth Element Analysis of Hydrothermal Scheelite from Mineralised Fault-Veins in the Glenorchy Region, NW OtagoBy J M. Palin
Hydrothermal scheelite precipitated in fault-veins at Paradise, Bonnie Jean, Davidson's and Glenorchy mines display chemical variability involving REE patterns that are transitional between two e
Jan 1, 2003
-
Two- and Three-Dimensional Numerical Analysis of the Interaction Between Open Pit Slope Stability and Remnant Underground VoidsBy M E. Pierce
Recent advances in comminution and heap leach technology have resulted in the development of many large-scale, low-grade open pit mines that coincide with areas of historical underground workings. Two
Jan 1, 2003
-
Evaluating Groundwater Impacts From Dewatering Operations to Support a Coal ProjectBy N J. Arunakumaren
A coal mine is proposed for an area where a major river traverses the project area. There were initial concerns that inflow of groundwater from exposures of high permeability alluvium associated with
Jan 1, 2003
-
Using Waste From Sand Mining to Reduce Environmental Impacts Coming From the Stocking ProcessBy L Soares, W T. Hennies, F Fujimur
Barra Bonita reservoir, located in the Sao Paulo State, Brazil, has been mainly used for local navigation and electricity generation to supply a prosper region in the country. Sand mining activities i
Jan 1, 2003
-
Revegetation of Mine Rockdumps Using Indigenous Mosses and Other Pioneer PlantsBy P Alspach, R Buxton, C Morgan, C Ross
Mining companies worldwide have an increasing interest in restoring indigenous ecosystems following mining. Low levels of plant nutrients and organic matter, pH extremes, heavy metals, physically chal
Jan 1, 2003
-
Impact of Blast Fragmentation on Hydraulic Excavator Dig TimeBy D Thornton, R Hodson, D Sprott
Blast fragmentation size distribution and thus blast design have been found to have a direct impact on the load and haul cycle through excavator dig time and bucket payload. Previous studies have demo
Jan 1, 2003
-
A Practical Trial to Increase the Coal Recovery in Highwall Auger Mining in AustraliaBy T Ueda an, T Sasaoka, A Yabuki, H Shimada
The basic concept of auger mining is to extract coal beyond the economic limits of surface mining technology by drilling holes of an appropriate diameter size into the exposed seam of the highwall as
Jan 1, 2003
-
Proactive Measures for Fatality Prevention in the Mining Industry ù Why Fatalities Persist While Lost Time Injuries DeclineThe traditional measure of Lost Time Injury Frequency Rate (LTIFR) as a measure of improvement in safety performance is recognised as inadequate and misleading, lulling managers into believing that sa
Jan 1, 2003
-
Geology and Ore Estimation at the Callie Underground Gold Mine, Tanami, NTBy J Emslie
Newmont AustraliaÆs Callie Underground Gold Mine is located on the Dead Bullock Soak Mining Lease, approximately 600 km NW of Alice Springs, NT, in the Granites-Tanami Goldfield. Dead Bullock Soak is
Jan 1, 2003
-
Risk Transfer in a Hard Insurance MarketThe current insurance market has been brought about by a number of pressures, including: collapsing investment returns; growing losses, both normal and catastrophic; and reserve strengthening. Th
Jan 1, 2003
-
Wangaloa Coal Mine Rehabilitation - The First Six MonthsBy D Craw, C E. Martin, C Smith, C Rufaut
Wangaloa Coal Mine opened in 1945, and by the time of its closure in 1989, had produced 750 000 tonnes of coal and disturbed an area of 75 ha. The original mining licence required land rehabilitation
Jan 1, 2003
-
High Performance Throw Blasting With i-konTM Electronic Detonators in an Environmentally Sensitive Area at Stratford Coal, NSW, AustraliaBy T Goswami, M Edmondson
Henry Walker Eltin (HWE) are the mining contractors for Gloucester Coal at Stratford mine, which is in an environmentally sensitive area in the Avon Valley, NSW, Australia. Normal blasting at Stratfor
Jan 1, 2003
-
Natural Processes Removing Dissolved Arsenic from Selected West Coast StreamsBy C Noble, J Webster-Brown
A survey of selected West Coast Streams was undertaken in Summer 2001, Summer 2002 and Winter 2002 to establish the degree of arsenic (As) contamination in waters and sediments downstream of old coal
Jan 1, 2003
-
Redefining the Scale of OHS Problems ù Meaning of Risk Through the Mining Project Life CycleOptimisation of mining projects is directly related to effective and efficient management of risks through the life cycle of mining projects. Effective and efficient management of risks must include e
Jan 1, 2003
-
Optimisation of Excavator Performance When Mining Complex Polymetallic OresBy U Dzharlkaganov, B Bekmurzayevand M
The principle conception is presented of timely planning of winning operations in complex-structural blocks and faces in week-24-hourly regime. For adequate description of complex interconnections of
Jan 1, 2003
-
Geological and Grade Risk at the Golden Gift and Magdala Gold Deposits Stawell, Victoria, AustraliaBy M Stewart, J Vann, A Bu, D Frederickson
The Golden Gift is a recently discovered deep deposit below the main operating areas of the Stawell Gold Mine. At an early stage of the project, diamond drilling was used to define the mineralisation
Jan 1, 2003
-
Recording and Usage of Groundwater Data for a Mining OperationKnowledge of the hydrogeological setting of a mine forms an integral part of a mining operation. Groundwater impacts, initially, on mine feasibility. Then, on commencement of mining, it interacts on t
Jan 1, 2003
-
Stakeholders and Financial Risk ù Cawse Nickel Operations Case StudyMining projects draw together stakeholders with various degrees of experience in managing and assessing financial risk. When this risk is not fully appreciated or quantified, the potential for making
Jan 1, 2003