Zone 4 North 520-7350E & 590-7215E Freeze Drifts Development

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 28
- File Size:
- 2455 KB
- Publication Date:
- Nov 1, 2011
Abstract
Overview ?Overview of the mining area ?Description of the mining phases ?Risk assessment ?Design criteria and description for freeze drifts ?Freeze wall design ?Raisebore mining Four Main Phases: 1.Development of freeze drifts on the 520 and 590 levels 2.Freeze drilling and ground freezing to isolate the Zone 4 North ore body from water bearing sandstone. 3.Develop raisebore and extraction chambers including access drifts and ramps under freeze protection. 4.Start raisebore production mining of the Zone 4 North area.
Citation
APA:
(2011) Zone 4 North 520-7350E & 590-7215E Freeze Drifts DevelopmentMLA: Zone 4 North 520-7350E & 590-7215E Freeze Drifts Development. Canadian Institute of Mining, Metallurgy and Petroleum, 2011.