Soon after the Waelz p1an.t for the fire concentration of low-grade zinc ores was put into operation in the early part of 1929 at Katowice, it was found that the conveyor equipment for transporting the hot residue from the furnace dust chambers was inadequate. Hand tramming with water cooling was used for a time, but that method was injurious to the workmen as well as costly. The problem was to find some practical mechanical means of conveying flue dust at temperatures of from 450" to 600°C. as it was drawn from the dust chambers. After considerable preliminary investigation it was decided to install pneumatic equipment for conveying the hot materials to a central mixing plant, where it would be mixed with slime and from which it would be returned to the furnace feed hoppers. The first pnenmatic equipment was installed in 1930, and has been in successful operation since that time. The pneumatic method of transportation has shown a considerable saving in operating costs over the former methods of dust handling and a decided improvement in working and hygienic conditions at the plant, through the elimination of the dust hazard. Additional pneumatic equipment mas installed in 1933 for conveying the furnace fume from the baghouses to the roaster plant. At the same time pick-up lines were provided for collecting the cleanings from the vertical and horizontal cooling pipes that are between the furnace dust chambers and the baghouses. The latter installation has practically eliminated a dusty and costly hand-tramming operation. A third extension was made to the pneumatic system in 1938 for conveying 'the zinc-lead-cadmium fume from the roaster-plant baghouses and flues to a new re-treatment plant for secondary products. The success of pneumatic conveying at the Waelz plant was the determining factor in the decision to install another pneumatic unit at the Saeger zinc-roasting and sintering plant. The new unit at Saeger was installed early in 1938 for the transportation of flue and Cottrell dust, small amounts of flotation concentrates to the sinter machines, and
Citation

APA: Roy E. Thomas  (1944)  Zinc - Pneumatic Conveying at Giesche Spolka Akcyjna, Poland (Metals Technology, Feb. 1939).

MLA: Roy E. Thomas Zinc - Pneumatic Conveying at Giesche Spolka Akcyjna, Poland (Metals Technology, Feb. 1939).. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1944.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account