Wilkes-Barre, Pa.Paper - Power Installation at Coverdale Mine

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 14
- File Size:
- 751 KB
- Publication Date:
- Jan 1, 1922
Abstract
A thoroughly modern coal-handling system has been installed at the Pittsburgh Terminal H. H. &. Coal Co.'s new No. 8 shaft, or Cover-dale mine, about 11 mi. (17.7 km.) from Pittsburgh on a spur of the Montour R. R. The Pittsburgh scam, which is the one worked, is reached at a depth of 342 ft. (104 m.). Power is delivered to the mine at 22,000 volts over a transmission line of the bow-arrow type of construction. A private telephone line connecting the various mines and the main office in Pittsburgh is carried on the same poles. The high-tension line is brought to an outdoor, step-down, transformer substation, where three 833-kv.-a., single-phase, 60-cycle, oil-insulated, self-cooled transformers reduce the potential to 2300 volts. The transformers are protected by electrolytic, aluminum-cell lightning arresters, horn gaps, and choke coils. High and low-tension busses, together with fuses, choke coils and air-break horn-gap switches with thcir remote-control operating mechanism are mounted on a substantial structural-steel tower 25 ft. (7.6 m.) in height. Mine Substation The transformer substation is adjacent to a. pressed-brick building that houses direct-current substation equipment together with switchboards, etc., for the control and distribution of power. This building also contains the hoist for the men and supplies. Main Switchboard The 2300-volt circuit is carried underground in a conduit from the transformer substation to an oil switch in the substation and supply hoist building. This is the main switch controlling the 2300-volt busbars mounted back to a twelve-panel black-slate switchboard. From the switchboard, 2300-volt circuits are carried to transformers feeding the street and house lighting systems and to other transformers furnishing power for the elevator and lighting circuits in the store building. Other 2300-volt circuits run from this switchboard to the main hoist building, fan house and auxiliary or man-and-supply hoist. High-tension wiring,
Citation
APA:
(1922) Wilkes-Barre, Pa.Paper - Power Installation at Coverdale MineMLA: Wilkes-Barre, Pa.Paper - Power Installation at Coverdale Mine. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1922.