Water Treatment at Waihi Gold Mine

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 11
- File Size:
- 837 KB
- Publication Date:
- Jan 1, 1991
Abstract
The Martha Hill project operates with a nett surplus of water, due to the catchment of rainwater on the tailings dam and the requirement to de-water the open pit mine. It is necessary to discharge this surplus, treated as required, to the Ohinemuri River which flows past the process plant. The treatment plant, adjacent to the process plant, handles all effluent from the Martha Hill operation including water pumped from the mine, excess water from the tailings decant, and seepage from the tailings dam underdrains. To-date the plant has treated and discharged over 800 000 tonnes of water.
Citation
APA: (1991) Water Treatment at Waihi Gold Mine
MLA: Water Treatment at Waihi Gold Mine. The Australasian Institute of Mining and Metallurgy, 1991.