This project includes the excavation and concrete lining of approximately 18 900 m (62 000 ft) of 5.5 m (18 ft) finished diameter subway tunnel for the Los Angeles MTA. The project required that four soft ground headings be excavated from a single shaft located near the mid point of the tunnels. The tunnels were classified "gassy" during the excavation phase. Because of the contract schedule requirements and the limited urban work site available, many logistical problems had to be overcome during the project while excavation was accomplished at a record setting pace. Some unique project features include the muck handling system and an access shaft using a high strength tieback support system. In order to accomplish the work, an extensive effort to plan and construct the main work site was required.
Citation

APA: Robert B. Gordon Dennis K. Poulton Shelley M. Burg  (1995)  Vermont/Hollywood Tunnel Project Los Angeles Metro Redline Contract B251 Development of the Main Work Site Los Angeles, California

MLA: Robert B. Gordon Dennis K. Poulton Shelley M. Burg Vermont/Hollywood Tunnel Project Los Angeles Metro Redline Contract B251 Development of the Main Work Site Los Angeles, California. Society for Mining, Metallurgy & Exploration, 1995.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account