Various Rock Tunneling Methods Utilized on the Doan Valley Storage Tunnel Project - RETC2023

Society for Mining, Metallurgy & Exploration
Collin Schroeder Chris Lynagh
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
11
File Size:
184 KB
Publication Date:
Jun 13, 2023

Abstract

Determining the best excavation method is a critical step in successful tunnel construction. In rock tunneling, several factors can dictate the excavation method, such as: (1) rock characteristics, (2) tunnel size and length, (3) nearby utilities/infrastructure, and (4) contractor’s preferred means and methods. This paper discusses the various rock tunnel excavation methods utilized on the Doan Valley Storage Tunnel Project (DVT), a project constructed as part of the broader Project Clean Lake in Cleveland, Ohio. The differences between each method’s initial and final lining, geology, and cycle sequence will be analyzed and compared.
Citation

APA: Collin Schroeder Chris Lynagh  (2023)  Various Rock Tunneling Methods Utilized on the Doan Valley Storage Tunnel Project - RETC2023

MLA: Collin Schroeder Chris Lynagh Various Rock Tunneling Methods Utilized on the Doan Valley Storage Tunnel Project - RETC2023 . Society for Mining, Metallurgy & Exploration, 2023.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account