Tunnel Design of Muni Metro Turnback Project

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 20
- File Size:
- 899 KB
- Publication Date:
- Jan 1, 1995
Abstract
The MUNI Metro Turnback (MMT) Project includes a 256 m (840 ft) twin tunnel section, which connects to the Embarcadero Station, and runs under Market Street in San Francisco. The tunnels go through a mixed face condition of fill at top and Bay Mud at bottom, and a significant number of buried timber piles. This paper presents the selection of tunneling equipment, excavation methods, excavation support and chemical grouting; specification of timber pile cutting methods; and steel lining analysis and design. This paper also reports on the initial phase of the tunnel construction.