The Use Of Drilling And Pregrouting Prior To Excavation Of Mine Shafts

Society for Mining, Metallurgy & Exploration
Martin C. Jones
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
12
File Size:
413 KB
Publication Date:
Jan 1, 1979

Abstract

INTRODUCTION This paper outlines the methods used to drill and pregrout prior to the excavation of five Mine Shafts in the Coal Measures of the Eastern United States. One example is the use of cement pregrouting of four 240 meter deep shafts and the second is the use of chemical pregrouting of a 360 meter deep shaft. These two examples will be compared and contrasted, both at the investigation stage of each project, and during the drilling and pregrouting itself, to illustrate the different approaches taken and how these affected the outcome, both technically and economically. INVESTIGATION FOR 240 METER SHAFTS In the case of the four 240 meter shafts, site investigation was carried out prior to bid, and information was made available by the Client in the form of a report. This report was based on pressure testing of NQ cored boreholes at each shaft site. Pressure testing was repeated two or more times, at each test setting, using 345 or 690 kPa of water pressure in accordance with the procedure outlined by the U. S. Bureau of Reclamation. Flow readings were taken every minute over a period of ten minutes. Maximum computed permeabilities, for the strata which accepted water under test for the shafts, carried between 1.0 x 10-6 m/s and 3.0 x 10-6 m/s, and total calculated seepages varied between 170' litres/minute to 3891 litres/minute. Although these figures did not indicate an excessive amount of seepage, the Client decided that pregrouting should be carried out, and chemical grouting was not discussed, even though the test permeabilities indicated the use of cement grout would be limited in this case.
Citation

APA: Martin C. Jones  (1979)  The Use Of Drilling And Pregrouting Prior To Excavation Of Mine Shafts

MLA: Martin C. Jones The Use Of Drilling And Pregrouting Prior To Excavation Of Mine Shafts. Society for Mining, Metallurgy & Exploration, 1979.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account