Abstract

Replacement of the Monroe Street Viaduct in southwest Baltimore City, Maryland included transforming 240 feet of the south approach from a pile-supported multi-span bridge to a mechanically stabilized earth (MSE) embankment supported by vibro-concrete columns (VCCs) and a load transfer platform. The project area was underlain with highly compressible soils which would have resulted in up to 18 inches of settlement under the proposed embankment load. Adjacent structures and critical underground utilities would have been impacteded or damaged by this settlement. Various load transfer alternatives were evaluated to mitigate the anticipated settlement by supporting the embankment on a deeper, more competent stratum. The alternatives considered included compaction grout columns, stone columns, deep soil mixing, and VCCs. Deep soil mixing was eventually selected for design, however, as part of a value engineering proposal, the general contractor Joseph B. Fay Company, with assistance from Hayward Baker and the Collin Group, prepared and submitted an alternative consisting of VCCs. This paper presents the details of the value load transfer platform and VCC design. Loading tests were utilized to confirm the VCC capacity and field changes were implemented based on the test results.
Citation

APA: Paul J. Lewis  (2007)  The Monroe St. Viaduct: A Case History Of MSE Vibro-Concrete Column Supported Embankment

MLA: Paul J. Lewis The Monroe St. Viaduct: A Case History Of MSE Vibro-Concrete Column Supported Embankment. Deep Foundations Institute, 2007.