The Life Cycle of a Mine Tailings Dam

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
11
File Size:
768 KB
Publication Date:
Jan 1, 1975

Abstract

A case-study is presented of the tailings dam of Nairne Pyrites Pty. Ltd., at Brukunga, South Australia. The methods of-construction and operation of the dam are outlined over the whole working life of the mine. Procedures of soil mechanics used to estimate the stability 'of the face of the dam are described, and seepage problems are dis- cussed. It is concluded that the dam is basically stable, and enabled Nairne Pyrites Pty. Ltd. to dispose of tailings economically, although more attention to seepage control may have been ad- vantageous. Suggestions are made on the construction and operation of tailings dams elsewhere.
Citation

APA:  (1975)  The Life Cycle of a Mine Tailings Dam

MLA: The Life Cycle of a Mine Tailings Dam. The Australasian Institute of Mining and Metallurgy, 1975.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account