The Kidd Creek copper smelter an update on plant performance

Canadian Institute of Mining, Metallurgy and Petroleum
C. J. Newman A. G. Storey G. Macfarlane K. Molnar
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
8
File Size:
6264 KB
Publication Date:
Jan 1, 1992

Abstract

"The Kidd Creek copper smelter started operation in June 1981 using the Mitsubishi Continuous Smelting Process. A steady increase in plant production rates has been demonstrated, and the annual tonnage of concentrate smelted is now double the original design rate. This paper summarizes recent modifications made to increase concentrate feed rates, increase on-line time, reduce copper losses and control the impurity level in anode copper. It includes improvements made to furnace design, improvements to reduce downtime f or boiler cleaning, and improvements made to the acid plant to allow handling of increased gas flowrates and higher gas strengths while maintaining low acid plant emission rates. IntroductionThe Kidd Creek Division of Fal conbridge Limited operates a base-metal mining and metallurgical complex, located in Timmins, Ontario, which includes an underground mine, a 13 500 tonne/day concentrator, a 130000 tonne/year zinc plant and a copper smelter and refinery, The copper smelter and refinery were commissioned in 1981, with an installed capacity of 59 000 tonnes/ year of cathode. The smelter, utilizing the continuous smelting technology of the Mitsubishi Process, has subsequently been expanded in production capacity, and in 1991 produced 113 500 tonnes of blister copper The capacity of the refinery, which uses Onahama No. 3 tankhouse technology, has been increased to 96 000 tonnes/year of cathode. The capacity increase at the smelter has been realized through the input of additional oxygen to both the smelting and converting furnaces, without increasing the process off-gas flowrate through the associated waste heat boilers.In this paper, a brief review of smelter operation and modifications in the period 1982 to 1987 is presented, together with a more detailed discussion of operation during 1988 to 1991, and a discussion of future planned improvements."
Citation

APA: C. J. Newman A. G. Storey G. Macfarlane K. Molnar  (1992)  The Kidd Creek copper smelter an update on plant performance

MLA: C. J. Newman A. G. Storey G. Macfarlane K. Molnar The Kidd Creek copper smelter an update on plant performance. Canadian Institute of Mining, Metallurgy and Petroleum, 1992.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account