The Flash Smelter at Mount Morgan Limited

The Australasian Institute of Mining and Metallurgy
Warner B. D
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
6
File Size:
114 KB
Publication Date:
Jan 1, 1974

Abstract

Smelting at Mount Morgan started in 1906 with blast furnaces which were replaced by a reverberatory furnace in 1939. The second reverberatory, commissioned in 1944, was replaced by a copper flash smelter in 1972. Flotation concentrates, dried to 0.05 per cent moisture, were oxidised under accurately controlled conditions and produced 45 per cent Cu matte and a slag in the flash smelter. The matte was converted to blister copper and the slag was slowly cooled before grinding and retreatment in a flotation concentrator.
Citation

APA: Warner B. D  (1974)  The Flash Smelter at Mount Morgan Limited

MLA: Warner B. D The Flash Smelter at Mount Morgan Limited. The Australasian Institute of Mining and Metallurgy, 1974.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account