Smelting at Mount Morgan started in 1906 with blast furnaces which were replaced by a reverberatory furnace in 1939. The second reverberatory, commissioned in 1944, was replaced by a copper flash smelter in 1972. Flotation concentrates, dried to 0.05 per cent moisture, were oxidised under accurately controlled conditions and produced 45 per cent Cu matte and a slag in the flash smelter. The matte was converted to blister copper and the slag was slowly cooled before grinding and retreatment in a flotation concentrator.
Citation
APA:
(1974) The Flash Smelter at Mount Morgan LimitedMLA: The Flash Smelter at Mount Morgan Limited. The Australasian Institute of Mining and Metallurgy, 1974.