The Extraction of the No. 1 Shaft Pillar at Blyvooruitzicht Gold Mine

The Southern African Institute of Mining and Metallurgy
K. R. Noble
Organization:
The Southern African Institute of Mining and Metallurgy
Pages:
11
File Size:
435 KB
Publication Date:
Jan 1, 1987

Abstract

The planned extraction of the No. 1 shaft pillar at Blyvooruitzicht Gold Mine highlighted a number of potential problems. In spite of the relative shallowness, careful thought had to be given to stope phasing owing to the detrimental effect of the anticipated geology and the fact that uninterrupted hoisting was necessary. Extensive use was made of computer modellig to design the stope phasing, determine the influence of regional support and to predict the direction and magnitude of displacements in the shaft. The paper describes the success of this design approach, and measured displacements in the stoping horizon and shaft barrel are compared to those obtained from the original computer model
Citation

APA: K. R. Noble  (1987)  The Extraction of the No. 1 Shaft Pillar at Blyvooruitzicht Gold Mine

MLA: K. R. Noble The Extraction of the No. 1 Shaft Pillar at Blyvooruitzicht Gold Mine. The Southern African Institute of Mining and Metallurgy, 1987.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account