The evaluation, design and construction of the uranium plant for Chemwes Limited

The Southern African Institute of Mining and Metallurgy
E. B. Viljoen J. L. Taylor J. E. Robinson B. J. Bluhm P. Le Grange W. Pilkington
Organization:
The Southern African Institute of Mining and Metallurgy
Pages:
8
File Size:
1556 KB
Publication Date:
Jan 1, 1981

Abstract

The Chemwes uranium plant was designed and constructed within fifteen months; commissioning started during. June 1979, and the plant was producing at design capacity four months later. This account highlights the procedures and methods adopted to bring the plant Into production. The description of the various phases includes some details of the early evaluation, and the feasibility and optimization studies; of the financing, project management, design, construction, and commissioning of the plant; and of the training of personnel. Some of the mistakes made and the factors that contributed to the success are also listed.
Citation

APA: E. B. Viljoen J. L. Taylor J. E. Robinson B. J. Bluhm P. Le Grange W. Pilkington  (1981)  The evaluation, design and construction of the uranium plant for Chemwes Limited

MLA: E. B. Viljoen J. L. Taylor J. E. Robinson B. J. Bluhm P. Le Grange W. Pilkington The evaluation, design and construction of the uranium plant for Chemwes Limited. The Southern African Institute of Mining and Metallurgy, 1981.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account