The Estimation of Preliminary Capital Costs

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 19
- File Size:
- 527 KB
- Publication Date:
- Jan 1, 1978
Abstract
Several capital cost estimation procedures are reviewed briefly, although the factored estimate method is discussed in preference. A table of cost versus equipment parameter data is provided, where the cost may be updated from the current value of the M&S cost index for mining and milling. Cost equations are useful to prepare computer programs which perform capital cost calculations. The use of the factored estimate method is illustrated.