The development of ultra-fine grinding at Anglo Platinum - Synopsis

The Southern African Institute of Mining and Metallurgy
A. K. Anyimadu
Organization:
The Southern African Institute of Mining and Metallurgy
Pages:
8
File Size:
729 KB
Publication Date:
Jan 1, 2007

Abstract

Ongoing development work on ultra-fine grinding for various applications at the Group?s concentrators has been conducted by Anglo Platinum over the last few years. Current potential applications for mainstream grinding and concentrate grinding are the subject of a group-wide research and development programme. The first 10 000-litre 2.6 MW IsaMill was jointly developed by Anglo Platinum, Xstrata Technology and Netszch for installation at the Western Limb Tailings Re-treatment project in Rustenburg, South Africa. The unit was commissioned in late 2003/early 2004, and has operated in an intermediate concentrate regrind application successfully since. This paper describes the operational performance to date, as compared with the original duty specifications and objectives. The first mainstream M10 000 IsaMill with a 3 MW drive will be operational in November 2006 at the Potgietersrus Platinum (PPL)?Platreef? Sandsloot Concentrator in South Africa?s Limpopo Province. Keywords: Western Limb Tailings Re-treatment Plant, IsaMilling, Platreef, platinum, palladium, PGMs, tailings.
Citation

APA: A. K. Anyimadu  (2007)  The development of ultra-fine grinding at Anglo Platinum - Synopsis

MLA: A. K. Anyimadu The development of ultra-fine grinding at Anglo Platinum - Synopsis. The Southern African Institute of Mining and Metallurgy, 2007.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account