The Design And Operation Of The Cemented Hydraulic Fill Station Mount ISA Mines Limited

The Australasian Institute of Mining and Metallurgy
Slaughter P. J Kerr M. H
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
6
File Size:
268 KB
Publication Date:
Jan 1, 1973

Abstract

Design of the new cemented hydraulic fill plant was based mainly on experience with a succession of previous fill plants. Two stage cycloning of combined concentrator tailings was introduced. Design of the two stage cyclone configuration was assisted by computer simulation of cyclone performance. Cementing additives, namely Portland cement and ground copper reverberatory furnace slag, drawn from bulk storage, are pre-slurried prior to mixing with hydraulic fill. Quality control of fill being sent under- ground is achieved by a series of automatic control loops. Plant instrumentation was given prime consideration during the design phase. Inventory checks of all mass flow metering equipment are made at regular intervals. Fill is pumped to boreholes at several locations. Details of the equipment and operating procedures for the plant are Discussed.
Citation

APA: Slaughter P. J Kerr M. H  (1973)  The Design And Operation Of The Cemented Hydraulic Fill Station Mount ISA Mines Limited

MLA: Slaughter P. J Kerr M. H The Design And Operation Of The Cemented Hydraulic Fill Station Mount ISA Mines Limited. The Australasian Institute of Mining and Metallurgy, 1973.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account