The Inland Feeder project is a critical component of Southern California’s water delivery system, relying on a strategic plan of water transfer and storage to enable the delivery of an additional 650 million gallons of water a day. The Arrowhead West and Arrowhead East tunnels form part of this system, comprising the construction of nearly13 km (8 miles) of bored tunnel under the San Bernardino National Forest. This paper describes the design and manufacture of the 4.88 m (16 ft) diameter precast segmental primary lining that will be used in these tunnels to resist rock loads, and up to 275 m (900 ft) of external hydrostatic head.
Citation

APA: Michael R. King Mehdi Ghazi Christopher Hebert  (2003)  The Design and Manufacture of the Arrowhead Tunnels Project Precast Segmental Lining

MLA: Michael R. King Mehdi Ghazi Christopher Hebert The Design and Manufacture of the Arrowhead Tunnels Project Precast Segmental Lining. Society for Mining, Metallurgy & Exploration, 2003.