The control of pebble mills at Buffelsfontein Gold Mine by use of a multi variable peak-seeking controller

The Southern African Institute of Mining and Metallurgy
O. G. Pauw
Organization:
The Southern African Institute of Mining and Metallurgy
Pages:
8
File Size:
582 KB
Publication Date:
Jan 1, 1985

Abstract

The relationships between mill power and pebble load, bulk density of the load, and circulating load were investigated on the pebble mills in the grinding circuit at Buffelsfontein Gold Mine. This paper describes the most significant relationships among the operating and control variables on the plant, and illustrates these by reference to experimental data gathered from the plant during operation. The results were used for the development of very successful multivariable peak-seeking controllers for the pebble load and bulk density of the load on these pebble mills. The peak-seeking control algorithms are described in detail. The control system has operated successfully at Buffelsfontein for more than 18 months and is still in operation.
Citation

APA: O. G. Pauw  (1985)  The control of pebble mills at Buffelsfontein Gold Mine by use of a multi variable peak-seeking controller

MLA: O. G. Pauw The control of pebble mills at Buffelsfontein Gold Mine by use of a multi variable peak-seeking controller. The Southern African Institute of Mining and Metallurgy, 1985.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account