The relationships between mill power and pebble load, bulk density of the load, and circulating load were investigated on the pebble mills in the grinding circuit at Buffelsfontein Gold Mine. This paper describes the most significant relationships among the operating and control variables on the plant, and illustrates these by reference to experimental data gathered from the plant during operation. The results were used for the development of very successful multivariable peak-seeking controllers for the pebble load and bulk density of the load on these pebble mills. The peak-seeking control algorithms are described in detail. The control system has operated successfully at Buffelsfontein for more than 18 months and is still in operation.
Citation
APA:
(1985) The control of pebble mills at Buffelsfontein Gold Mine by use of a multi variable peak-seeking controllerMLA: The control of pebble mills at Buffelsfontein Gold Mine by use of a multi variable peak-seeking controller. The Southern African Institute of Mining and Metallurgy, 1985.