The Channel Tunnel Current Status Of The French Tunnel Work

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 18
- File Size:
- 683 KB
- Publication Date:
- Jan 1, 1989
Abstract
SUMMARY In August 1986, TRANSMANCHE LINK, a joint venture comprising the 10 companies who initially promoted the project, signed a contract with EUROTUNNEL for the design, construction and commissioning of the TRANSMANCHE fixed link for an amount of 4,5 billion dollars. On the French side, the work consists of digging three, 19km. long tunnels, of which almost 16 kms. are under the sea, up to the meeting point with the Tunnel works carried out by the British.. The tunnels are bored through chalk by 5 tunnelling machines, starting from one intermediate point at Sangatte near the coast: - Landward, they are drilled trough permeable strata of white and grey chalk. - Seaward, mainly through relatively impermeable chalk marl, but with the presence of water in faulted zones, or in grey chalk.
Citation
APA:
(1989) The Channel Tunnel Current Status Of The French Tunnel WorkMLA: The Channel Tunnel Current Status Of The French Tunnel Work. Society for Mining, Metallurgy & Exploration, 1989.