Systems Analysis Of Longwall Mining Systems

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 10
- File Size:
- 648 KB
- Publication Date:
- Jan 1, 1985
Abstract
In many instances, the actual production from a longwall face does not equal the planned capacity. General problem areas that have been identified include face length and panel depth, face area and gate entry roof support, face conveyor and shearer wear, outby haulage system failures, number of entries in longwall gate development, and longwall move time. The performance of a longwall face is totally dependent on the interaction of these and other factors. To explore fully these interactions, a systems analysis of longwalls has been performed. In this paper, the systems approach, the factors considered in the analysis, and the results of the analysis are presented.
Citation
APA:
(1985) Systems Analysis Of Longwall Mining SystemsMLA: Systems Analysis Of Longwall Mining Systems. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1985.