Startup-Pelletizing Plants

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 1
- File Size:
- 19 KB
- Publication Date:
- Jan 1, 1977
Abstract
The training school program for operation of a Grate-Kiln System is a comprehensive, detailed presentation of equipment design and maintenance combined with operating philosophy and procedures. An outline is presented relating the sequence of required instruction. The program is initially concerned with acquainting personnel with terminology unique to pelletizing and the Grate-Kiln System. Depending on the scope of each individual contract, a discussion describing process equipment and the process flowsheet is conducted. The process flowsheet discussion describes preliminary unit operations. Grate-Kiln System unit operations, process gas flow and gas flow control philosophy, and system pressure relationship.
Citation
APA:
(1977) Startup-Pelletizing PlantsMLA: Startup-Pelletizing Plants. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1977.