Some Problems on Quarrying Rock Material of Rock Fill Dam with Concrete Facing by Blasting

International Society of Explosives Engineers
Zhang Zhenyu Wu Xinxia
Organization:
International Society of Explosives Engineers
Pages:
10
File Size:
78 KB
Publication Date:
Jan 1, 1998

Abstract

The blasting quarrying technology of rock material of rock-fill dam is one of the more complex problems in the field of engineering blasting at present. The Kuz-Ram model is not suited to predict fragmentation distribution under the geology condition of Tianshengqiao(TSQ) fist-step power station. The modification of kuz-Ram model is discussed. With reference to the idea of model establishment of Kuz-Ram model and according to the results of experimental blasting in-situ, two fragmentation prediction models-TSQ-1 and TSQ-2 model are presented which are adapted to the particular condition of rock material querying blasting of rock-fill dam with concrete facing of TSQ first-step power station. The rapid judgment method of qualified grade material and the method of optimizing blasting parameters are also presented in this paper.
Citation

APA: Zhang Zhenyu Wu Xinxia  (1998)  Some Problems on Quarrying Rock Material of Rock Fill Dam with Concrete Facing by Blasting

MLA: Zhang Zhenyu Wu Xinxia Some Problems on Quarrying Rock Material of Rock Fill Dam with Concrete Facing by Blasting. International Society of Explosives Engineers, 1998.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account