Soil Conditioning in Doha Metro Project—Qatar

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 10
- File Size:
- 912 KB
- Publication Date:
- Jan 1, 2016
Abstract
"The Doha Metro Project is one of the most relevant ongoing tunneling projects. The whole project consists of about 100 km of tunnels with 21 EPB TBMs working in the same period. Due to the variability of the geological formations, the soil conditioning is a relevant aspect of this project because the parameters should be frequently adjusted to achieve the best performances of the TBMs. The study of the soil conditioning has been carried out accurately to obtain the best results on site. The study of the geotechnical data, the choice of the most suitable foaming agents and polymers and the laboratory study of the soil conditioning has been a fundamental part of the job. The application of the soil conditioning products on site with the analysis of the TBM data have confirmed the preliminary study results with some correlation between the features of the ground and the soil conditioning parameters to be used. INTRODUCTION Phase 1 of the Doha Metro Underground project is composed by 3 lines able to bring passengers to all the points of interest in the Qatar capital city. The Red Line, also called coastal line, connects the north of the city to the south, and to the new Hamad International Airport, following the coast line. The Golden Line, called Historic Line, will connect the southern area of Doha to the “Aspire zone” the area of the city where many state of the art sport centers are located, passing through the old city center. The Green Line, named education line, will connect the old city center to the Doha Education City. All the lines are realized with 2 tubes, single track. The whole underground project is realized with 21 TBMs, excavation diameter of 7.10 m. The project has been divided in 4 packages, for a total excavation length of more than 100 km. The need to underpass roads, existing buildings, and to excavate, in some areas, at less than 100 m from the coast line, forced the choice of a tunneling system with Earth Pressure Balance (EPB), that involves in the project another fundamental aspect of this tunneling system: the soil conditioning. The soil conditioning has multiples functions in the EPB system such as to make the soil suitable to properly apply the pressure on the tunnel face and to be extracted effectively with the screw conveyor. To properly study this topic it was necessary to study the geological formations to be excavated, the hydrogeological conditions of the underground, the foam injection systems of the EPB TBMs and to perform specific tests to evaluate a suitable conditioning to be verified and adjusted during the real scale application."
Citation
APA:
(2016) Soil Conditioning in Doha Metro Project—QatarMLA: Soil Conditioning in Doha Metro Project—Qatar. Society for Mining, Metallurgy & Exploration, 2016.