Abstract
Minproc Engineers Inc. (Minproc) recently completed the construction and start-up of a process facility to treat 14,000 t/d of gold-silver ore at Kori Kollo, Bolivia. The comminution circuit consists of crushing and SAG-ball mill grinding. Breakage characteristics of the ore were determined and a circuit model developed. This enabled variations of the circuit to be simulated, and evaluated in terms of predicted performance to provide the criteria for final engineering design. Subsequently, analysis of the operating circuit provided data for circuit model-fitting. The validity of the original model and circuit performance predictions are discussed.
Citation
APA:
(1994) Simulation Of A 14,000 T/D Mill-An Aid To Process Design And Plant OptimizationMLA: Simulation Of A 14,000 T/D Mill-An Aid To Process Design And Plant Optimization. Society for Mining, Metallurgy & Exploration, 1994.