Shiralgin Mining and Processing Complex- Case Study of Gold Deposit Development in the Kyrgyz Republic

- Organization:
- International Mineral Processing Congress
- Pages:
- 7
- File Size:
- 594 KB
- Publication Date:
- Jan 1, 2018
Abstract
"NPO RIVS employs complex approach to engineering and design of the new facilities in close cooperation of Mining, Research, Hydrometallurgy, Design, Construction, Power Supply, Automation, Production and other departments. General Design Contractor (and then General Contractor) is directly involved in geological exploration, engineering surveys, floatability studies, feasibility study of process solutions and construction options. It delivers greenfield project and guarantee its efficient performance in future. Shiralgin is a small gold and copper deposit, gold average grade is 4.7 g/t. RIVS departments have studied ore floatability, developed process procedures for design and performed pilot testing. Construction of integrated plant including ore crushing and grinding, flotation and hydrometallurgy units with Dore gold production of 5 000 thousand tons ore per year (66.7 t/h) is recognized as economically viable. The technology used of separate dry stockpiling of flotation tailings and cyanidation tailings. Water circuit for concentration and hydrometallurgy is separated, too. Process design was performed based on BIM software like Autodesk Revit, Civil 3D, Rocscience slide using process procedures developed by RIVS Research units. Engineers provided modeling of primary crushing unit, coarse ore storage, main building (including grinding, flotation, thickening, filtration, loading, hydrometallurgy), tailings thickening unit, building for reagent storage and conditioning, tailings pond for dry stockpiling of flotation tailings and cyanidation tailings, sedimentation ponds, laboratories, infrastructure including Administration building and camp. Payback period is 3.5 years. 3D model of facility is currently stored at the State Agency of Geology and Mineral Resources affiliated to the Government of the Kyrgyz Republic.INTRODUCTION The Kyrgyz Republic has substantial potential of mineral resources including gold ores. Mining industry actively develops and involves international investors. Inventory includes 42 deposits (Figure 1) that have reserves of 616.4 t [1] of gold. The Kyrgyz Republic takes the third place in gold mining among CIS countries after Russia and Uzbekistan by producing up to 20 t annually."
Citation
APA:
(2018) Shiralgin Mining and Processing Complex- Case Study of Gold Deposit Development in the Kyrgyz RepublicMLA: Shiralgin Mining and Processing Complex- Case Study of Gold Deposit Development in the Kyrgyz Republic. International Mineral Processing Congress, 2018.