Settlements Due to Blasting Vibrations

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 10
- File Size:
- 758 KB
- Publication Date:
- Jan 1, 2016
Abstract
"INTRODUCTION The so called Porto Maravilha Project consists of the re-urbanization of a 500 ha area in the Rio de Janeiro port region. Several changes in local infrastructure are being implemented, including a significant change in the road system, with the demolition of the former “Via Perimetral” viaduct and construction of 4 new tunnels: • Saúde tunnel - 35 m long (Waimberg et al, 2014); • “Binária tunnel” - 1012 m long; • “Via Expressa” twin tunnels - 1850 m long each way. The tunnels were excavated almost completely in rock using conventional drill and blast methodology and only some short stretches in weathered rock, associated to faults zones, residual soils and marine sediments close to the tunnel portals. During excavation of access shaft and “Via Expressa” and “Binária” tunnels significant ground settlements as well as settlements of buildings founded both on shallow and deep foundations were measured. These values could not be associated to conventional tunneling induced settlement troughs. This paper focuses on the “Via Expressa” tunnels, presenting a brief description of the project as a whole, its geological and geotechnical background, monitoring results, and a discussion of possible causes of the measured settlements. PROJECT DESCRIPTION The Porto Maravilha Project is an integrated multidisciplinary action on behalf of the Rio de Janeiro city council with support from the State and Federal Governments. In addition to creating new conditions for working, housing, transport, culture and leisure for the resident population, it also promotes expressive economic development in the region (Portonovo, 2015). Porto Maravilha Project is carrying out actions for the recovery of the region’s historical heritage, as well as promoting the population´s social and economic development. One of the main benefits of the Porto Maravilha Project is the construction of the new traffic system in the port area, consisting of the Express and Binário roadways. The new project, which will replace the current Perimetral Rodrigues Alves viaduct system, will increase traffic flow capacity by 27%."
Citation
APA:
(2016) Settlements Due to Blasting VibrationsMLA: Settlements Due to Blasting Vibrations. Society for Mining, Metallurgy & Exploration, 2016.