Selection Of PCC Liner Segments And Compatible TBM For The San Antonio Tunnels

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 14
- File Size:
- 743 KB
- Publication Date:
- Jan 1, 1989
Abstract
Two 8.2 m diameter flood control tunnels are being constructed in the Taylor Shale Formation beneath San Antonio, Texas. These tunnels use precast concrete segments as final lining. This paper describes the features of the segments chosen for this project. The tunnels are being excavated with a hybrid Tunnel Boring Machine. This paper also describes the features of the TBM which make the machine compatible to the type of segments chosen.