SEC and the impact on a mills selection for DMC project

- Organization:
- International Mineral Processing Congress
- Pages:
- 14
- File Size:
- 1553 KB
- Publication Date:
- Jan 1, 2014
Abstract
"Antofagasta Minerals S.A. (AMSA), for its Centinela District Project, is currently developing, at a first stage, a new 90 ktpd Concentrator Plant incorporating Esperanza Sur (ESP Sur) and Encuentro (ENC) ores. In order to dimension properly main equipment, specifically for grinding circuit, a final decision has been taken using geological and metallurgical (comminution) data from both body ores. Data was analyzed internally within AMSA and its consultants to get a final proposed circuit for further engineering studies. Specific Energy Consumption (SEC) parameter is one of the main key factors for proper dimensioning. To get an accurate value different tests have been made and modelled to ESP Sur and ENC ores. Also, operational data from Esperanza operation has been taken into account due to its similar ore characteristics to ESP Sur ore and incorporated as input data for design. Depending on data, quality and amount, it is possible to estimate accuracy for project investment and risk level, hence investment decision can be taken under good and reliable information."
Citation
APA:
(2014) SEC and the impact on a mills selection for DMC projectMLA: SEC and the impact on a mills selection for DMC project. International Mineral Processing Congress, 2014.